Roofs & Reroofing

New Roofs and New Build Roofing in Auckland

We put the roof on new Auckland builds, extensions and garages: long run steel, metal tiles, concrete or clay tiles and membrane roofs, with the flashings, spouting and downpipes done by the same team.

Our Licensed Building Practitioner does or supervises the restricted roofing work, and our in house certifying plumber fits every pipe and flue that goes through it.

  • Licensed Building Practitioner, Roofing

  • Site Safe member logo

    Site Safe Member

  • Certifying Plumber, Certifying Gasfitter and Certifying Drainlayer

    Certifying Plumber, Gasfitter and Drainlayer

  • Google logo

    Google Rated 4.9

Get help with new roofs

Overview & Answer

How do you choose the right roof for a new house in Auckland?

Start with three things on your plans: the roof pitch, the exposure zone and the wind zone. Pitch decides which roofing is allowed, the zone decides how salt proof steel and fixings must be, and wind sets how it is held down. Send your plans and we tell you which roofs your site allows before you pick a colour.

Scope & Inclusions

  • Roofs for new houses, extensions and minor dwellings
  • Long run, metal tile, tile and membrane roofs
  • Underlay, purlins and fixings to suit your zone
  • Flashings, flues, vents and pipe boots
  • Spouting in steel, aluminium, stainless, copper or PVC
  • Records of work for your Code Compliance Certificate

New roof, or a different job?

  • Old roof coming off a house you already live in?

    Reroofing
  • Choosing spouting and downpipes?

    Spouting
  • Only a flashing at a wall, chimney or skylight?

    Flashings
  • Water getting through a roof you already have?

    Roof Leaks

Planning & Choices

Six things that decide your roof

Most are already on your consent plans.

  • Pitch

    Every roofing type has a lowest slope it can go on. A flat looking modern roof usually means trapezoidal, tray or membrane, not corrugate.

  • Distance from salt water

    The closer you are to surf or harbour, the tougher the coating and the fixings need to be. Wind off the sea pushes that further inland.

  • Wind zone

    Hilltops and open coast get the strongest gusts. Higher wind zones need closer fixings, underlay under tiles and sometimes eaves flashings.

  • Weight

    Concrete and clay tiles are heavy, so the trusses and framing must be designed for them. Steel and metal tiles suit light roof framing.

  • Run length and rainfall

    A long sheet at a low pitch carries a lot of water in an Auckland downpour. The profile has to be deep enough to carry it to the spouting.

  • Tank or town water

    If the roof fills a drinking water tank, every material on it and the spouting below has to be safe for that water.

Materials & Profiles

What we put on new roofs

We install all four. Your pitch, zone and budget pick between them.

  • Long run steel

    Corrugate, trapezoidal, tray or standing seam, rolled to length so most roofs need no end laps.

  • Pressed metal tiles

    The look of tiles at a fraction of the weight. They need a steeper roof than long run and suit hipped homes with lots of corners.

  • Concrete and clay tiles

    Heavy, quiet in rain and long lasting, but they need a steep pitch, underlay and framing designed to carry the load.

  • Membrane roofs

    Rubber, TPO or torch on sheets for low slope roofs, decks over rooms and box gutters. They are never truly flat: water must still run off.

Builds & Reroofs

Which page is your job on?

This page covers roofs going onto new framing. An old roof coming off a house you already own is a reroof, with its own rules on consent and asbestos, so head to our Reroofing page.

These all count as new roof work:

  • A new house or bach
  • An extension or second storey
  • A minor dwelling or granny flat
  • A garage, carport or sleepout
  • A lean to or roof over a deck
  • A changed roof shape on an existing home

Changing the shape or pitch of an existing roof needs a building consent, so it is planned like a new roof even though people live underneath.

Proof & Promise

Why get Taylor to put your roof on?

  • Our own LBP on the roof

    Restricted roofing work is done or supervised by our Licensed Building Practitioner, who gives you and the council the record of work at the end.

  • Roof and plumbing together

    Flues, vents, solar pipes and the hot water overflow go through the roof as it goes on, fitted and sealed by our in house certifying plumber. Our labour carries a lifetime workmanship guarantee, with parts under the maker's warranty.

  • Roof water to the drain

    Spouting in steel, aluminium, stainless, copper or PVC, downpipes, then the stormwater connection laid and signed off by our in house certifying drainlayer. One firm from ridge to drain.

  • Steel picked for your site

    We check your distance from surf and harbour water against the maker's categories before ordering, and pick fixings and flashings to match.

  • Inspections booked for you

    We book the council inspections for our part of the job and have the plans, product details and paperwork on site when the inspector arrives.

  • Safe at height on every roof

    Scaffold or edge protection is standard on every new roof, and WorkSafe hears about any drop of 5 m or more before we start.

Pitch & Profile

How low can the roof go?

E2/AS1, the Building Code's standard route for keeping water out, sets the lowest pitch for each roof. For long run steel it is 8 degrees for corrugate and 3 or 4 degrees for deeper trapezoidal and tray profiles. Metal tiles start at 12 degrees, and concrete or clay tiles need 15 to 25 degrees depending on the tile.

Those are minimums for the sheet as laid. Long runs at low pitches can also overflow the profile, so we check the run length too.

Coast & Corrosion

Salt, sea spray and your exposure zone

NZS 3604 splits the country into exposure zones. Zone D covers everywhere within 500 m of the coast, 100 m of tidal estuaries and sheltered inlets, and all offshore islands. E2/AS1 adds zone E for breaking surf beach fronts. BRANZ puts all of Auckland in zone C or D, and surf beach fronts like Piha and Muriwai can reach E.

Roofing steel makers set their own categories by distance from the sea, and their warranties get shorter the closer you build. Near surf, some standard coatings are not recommended at all.

Structure & Layers

Underlay, purlins and fixings

Underlay goes under metal and tile roofs to catch condensation and any wind driven rain, laid on mesh or strapping so it cannot sag. On slopes under 10 degrees it now has to run across the roof, not down it.

Purlins are spaced to suit the profile and your wind zone, and every screw is chosen for the zone. In zone D, bolts and brackets that weather or salt air can reach have to be stainless steel.

Weathertightness & Detailing

Where new roofs let water in

Water rarely beats a sheet. It gets in at the junctions: where the roof meets a wall, around a flue, at a valley or along the barge. Clause E2 says the roof must keep water out, and E2/AS1 shows the flashings that do it.

In very high and extra high wind zones, metal roofs under 10 degrees with narrow soffits also need eaves flashings. Our flashings page goes through each type.

Consent & Inspections

Where the roof fits in the consent

A new house or extension is built under a building consent, and the roof is part of it. Auckland Council inspects the build at set stages, and the roof framing and roofing are checked along the way.

Over half the homes consented in Auckland in June 2026 were townhouses, flats and units, where roofs meet parapets and fire separations. We book our inspections.

Licences & Registration

Restricted building work and the roofing licence

On a house that needs a consent, the roof cladding and its flashings are restricted building work, so a Licensed Building Practitioner holding the roofing licence must do or supervise them. The roof framing is restricted too, and is usually done or supervised by your builder's carpentry LBP.

Garages that stand alone are not restricted work, though the roof must still meet the Building Code. An approved owner builder can do restricted work on their own home without an LBP.

Records & Certificates

Records of work and producer statements

Your builder's LBP and our roofing LBP each hand over a record of work when their part is done. Council needs every one before it signs off the build.

Some consents also call for producer statements, listed in the consent conditions. Read them before the roof goes on, because a missing one holds up sign off.

Compliance & Handover

Getting your Code Compliance Certificate

Once the build passes its final inspection, the owner applies for the Code Compliance Certificate. Auckland Council has 20 working days to decide on a complete application, and the clock stops while it waits on missing paperwork.

If nobody applies within two years of the consent, council has to decide anyway. We hand over the record of work and product details the day the roof is done, so the roof is never the paper holding up your CCC.

Process & Steps

From your plans to a closed in roof

  1. 01

    Send us the plans

    Roof plan, elevations and the consent documents, or a site visit for an addition. We check pitch, zones, profile and penetrations.

  2. 02

    Written quote

    Materials, colours, flashings, spouting, timing and our workmanship terms in writing, GST shown. Steel is rolled to length once you say yes.

  3. 03

    Roof on

    Underlay, sheets or tiles, flashings and penetrations, timed with your builder so the frame is covered quickly.

  4. 04

    Sign off

    Spouting and downpipes finished, a clean site, then the record of work, product details and warranty paperwork handed over.

Costs & Quotes

What a new roof costs

Every new roof is priced from your plans or a site measure. You get a written, itemised quote with GST shown before anything is ordered.

What moves the price: roof area and pitch, hips, valleys and junctions, the roofing type and profile, the coating grade your zone needs, flues and other penetrations, edge protection or scaffold, spouting material (copper costs more than steel or PVC), travel and access.

If the design changes after the quote, we price the change in writing before ordering more.

Call out rate: $145 + GST, first 45 minutes on site, travel included in metro Auckland, office hours.

Request a quote

Auckland & Islands

New roofs across Auckland

From our Wiri depot we roof new builds in every zone, busiest in the growth areas of Manukau & Papakura, Pukekohe & Waiuku, Orewa & Silverdale, Henderson & Hobsonville and Kumeu & Helensville.

In a SMAF 1 or 2 stormwater area, many new roofs must drain through a retention and detention tank, so we plan the downpipes with it.

New builds on Waiheke, Great Barrier and rural blocks often drink off the roof, so our in house certifying plumber connects the tank, first flush diverter and overflow as part of the same job.

Clients & Projects

Builders, owners and owner builders

  • Builders

    Roofer and plumber on time for the frame, with the paperwork sorted for your final.

  • Owner builders

    Even with an owner builder exemption, a roof done by an LBP gives you a record of work and one less risk at sign off.

  • Extensions and additions

    New roof tied into the old one, with flashings and spouting that match and a single team for both roofs.

  • Granny flats and minor dwellings

    A small standalone home built under the granny flat exemption still counts as restricted work, so the roof needs an LBP.

Related & Similar

Related roof and new build services

Everything from the ridge to the drain on a new build.

View all roofing services

Questions & Answers

New roof questions

How much does a roof cost on a new build in Auckland?

Your plans set it. Size and pitch set most of it, then the roofing type, coating grade, hips and valleys, penetrations, scaffold and spouting. A simple gable in standard long run sits at the lower end; a steep hipped tile roof at the coast costs a lot more. Ask every roofer to price the same coating grade and flashings, or the quotes will not compare.

How long does it take to put a roof on a new house?

Usually a few days to a week of roofing once the frame is ready, longer for tiles, membranes or complex roofs. Your quote gives the start date and how long we expect to be on site. Weather sets the real pace, because nobody lays roofing in rain or strong wind.

What roof is best for a house near the sea in Auckland?

A roof made for your exposure zone, and all of Auckland is zone C or D. On a harbour or estuary edge that usually means a coastal grade coating; on a surf beach front, a marine grade aluminium or stainless option. Fixings and flashings must match the sheet, because salt attacks them first.

What is the lowest pitch for a long run roof?

Under E2/AS1, 8 degrees for corrugate, 4 for most trapezoidal profiles and 3 for tray. A long run or a sag in the framing needs more fall than that, so we check the run against the profile. Below 3 degrees, the roof needs a membrane.

Does a new roof have to be done by an LBP?

Yes, on a house or apartment built under a consent, or a granny flat built under the exemption. That is restricted building work, and our Licensed Building Practitioner does or supervises it on every roof we put on. The exception is an approved owner builder working on their own home.

Does a new garage or shed roof need a building consent?

A double garage does; a small shed often does not. Schedule 1 of the Building Act exempts some single storey detached buildings up to 30 m2 when they meet its conditions. Ask your council before starting if you are unsure, because a discretionary exemption cannot be given after the work is done.

What is a record of work for a roof?

A short form from the LBP saying which restricted work they did or supervised. It goes to you and the council when the roof is finished, and council asks for it before issuing your Code Compliance Certificate. It also stays on the property file, which helps when you sell.

Do I need a producer statement for my roof?

Only if your consent asks for one. Membrane roofs and engineered roof structures are the usual ones: a design statement goes in with the consent and a construction statement (PS3) comes at the end. On a membrane roof we provide the PS3 when council asks, with our record of work.

Is a metal roof or a tile roof better for a new house?

For most Auckland homes, metal. It is light, quick to close in, goes on a low pitch and handles rainwater tanks well. Tiles win on rain noise and lifespan, but cost more in framing and need a steeper pitch. Your designer and engineer settle it, and we roof either.

Can a membrane roof be completely flat?

No. E2/AS1 now sets 2 degrees, a fall of 1 in 30, as the minimum for membrane roofs, as does Auckland Council's AC2234 guidance. BRANZ recommends 3 degrees so it keeps draining over the life of the building. Water that sits on a membrane finds every seam and outlet.

Does a long run roof need underlay on a new build?

Yes. Underlay catches condensation off the underside of the steel and any rain that blows in, then drains it to the spouting. It goes in as the sheets go on, because it cannot be added later without lifting the roof.

What warranty comes with a new roof?

Two kinds. The steel maker covers the coating and the metal for a set number of years, shorter the closer you are to the sea, as long as the roof is washed where rain does not reach. Our workmanship terms are written into your quote, so you know what we cover before you say yes.

Can you put the spouting and downpipes on at the same time?

Yes, and it is better that way. The spouting goes up as the roof is finished and the downpipes go straight to the stormwater, so new walls and foundations never take roof water. Copper spouting can take water off a steel roof, but copper must never drain onto steel, because its runoff eats the coating.

Do terraced houses and apartments need different roofing rules?

Often, yes. A consented terrace or apartment roof is restricted building work, so our LBP does or supervises it, and shared walls, parapets and fire separations bring details a standalone house never has. In a unit title block the body corporate then maintains it, so it gets our records.

Will you work with my builder's timeline?

Yes. We book the roof in for when the frame passes its inspection, so the house is covered before linings go in. Tell us your builder's programme and we will plan the roof, spouting and plumbing around it.

Planning a new build?

Send the roof plan and elevations on WhatsApp to 021 121 4918 or through the form below, tell us how far the site is from the sea, and we will send back a written, itemised quote.

Get help with new roofs

Get my quoteGet a quote