Reroofing and Roof Replacement in Auckland

Patching has a natural end: rust bleeding through the paint, tiles crumbling underfoot, leaks in a new room every winter. Past that point we strip the old roof off and lay a new one on homes across Auckland and the islands. Most go to long run steel or corrugate, and we do tile and membrane roofs too.

We do the roof and the plumbing, so spouting, flashings, flues and pipes through the roof are sorted in the same job.

  • Licensed Building Practitioner, Roofing

  • Site Safe member logo

    Site Safe Member

  • Certifying Plumber, Certifying Gasfitter and Certifying Drainlayer

    Certifying Plumber, Gasfitter and Drainlayer

  • Google logo

    Google Rated 4.9

Get help with reroofing

Overview & Answer

When does a roof need replacing instead of repairing?

Replace the roof when rust has eaten through in several places, fixings will not hold, tiles crack as you walk them or new leaks keep appearing after each repair. One bad spot on a sound roof is a repair. We look on the roof and in the roof space, then tell you in writing which it is.

Before anyone touches the old roof

  1. Do not waterblast or sand it

    Homes built before 2000 can have asbestos in old fibre cement, chip tiles and shingles buried under later iron. Blasting, cutting or sanding releases the fibres, so leave it alone until it has been tested.

  2. Stay off it

    Brittle fibre cement, clear panels and rotten iron will not carry your weight. Check what you can from the ground, or from the ceiling hatch with a torch.

  3. Leaking right now?

    Our Roof Leaks page has the make safe steps, and we come out 24/7 to make a storm damaged roof safe.

  4. Photos for the quote

    Take photos from the ground and from the ceiling hatch, and note roughly when the house was built. That is usually enough to plan the first look.

Call 09 873 6671

Scope & Inclusions

  • Full strip and reroof in long run steel or corrugate
  • Coastal grade steel matched to your address
  • Tile and stone chip roofs to long run
  • Purlins and fascia checked and replaced
  • New underlay and roof space ventilation
  • Asbestos tested, then removed by a licensed removalist

Not sure it needs a whole new roof?

Signs & Timing

What tells us a roof is finished

Age alone does not decide it. These do.

  • Rust through, not just on top

    Once pinholes show daylight from the roof space, or the laps and eaves have rotted, the steel is gone.

  • Fixings that spin

    Screws and nails that turn without biting mean the purlins underneath are soft. New screws in rotten timber will not hold in a westerly.

  • Tiles breaking underfoot

    Old concrete tiles go soft and porous, and BRANZ says many 1940s tiles are brittle by now. If nobody can walk the roof without cracking more, replacing it beats patching.

  • Chip tiles going bald

    When the stone chip washes into the spouting, the pressed steel tile underneath starts to rust from the top down.

  • Leaks that move

    Fix one and another turns up somewhere else. That is a roof wearing out everywhere at once.

  • Drips on clear cold nights

    No underlay under the iron, which is common on older Auckland homes, means condensation runs onto the ceiling. A reroof is the time to put that right.

Materials & Profiles

What goes on in place of the old roof

Most Auckland reroofs end up in long run steel. The grade that matters depends on how far you live from salt water.

  • Prepainted long run

    Prepainted steel in corrugate or a trapezoidal profile, run in one length from ridge to spouting so there are no end laps to rust. The standard grade is rated for most New Zealand sites, inland or coastal.

  • Marine grade for the surf line

    Right on the beach and in the first strip back from breaking surf, the standard grade gives way to a premium sheet on a marine grade aluminium base.

  • Zinc aluminium

    Unpainted steel with a zinc and aluminium coating. Fine for sheds and inland homes, but its maker does not recommend it in severe or worse zones, and BRANZ says keep it 200 m from breaking surf.

  • Tile or stone chip to long run

    The heavy roof comes off and purlins sized for steel go on. A light roof is held down by its fixings, not its weight, so the uplift fixings get checked.

Strip & Overlay

Taking the old roof off, or going over it

Most reroofs are a full strip: old roofing off, purlins and underlay checked, new roof on.

An overlay, where a lightweight roof is fixed over the old one, can suit a sound frame with a single existing layer. We rule it out when:

  • The frame sags or the purlins are soft
  • The old roof has leaked long enough to rot timber

Sealing a failed roof under a membrane is a shortcut that fails in the end.

Proof & Promise

Why get Taylor to replace your roof?

  • Roof and plumbing in one job

    Flues, vents, solar pipes and spouting all go through or off the roof. Our in house certifying plumber refits and seals each one as the new roof goes on, and our labour carries a lifetime workmanship guarantee, with parts under the maker's warranty.

  • Steel picked for your address

    We measure how far you are from surf or harbour water against the steel's coastal zones before ordering, and confirm the warranty with its maker inside 100 m.

  • Asbestos done by the book

    Old roofs are tested before a sheet comes off. Asbestos removal goes to a WorkSafe licensed removalist, and you get the clearance certificate.

  • Scaffold up first

    Scaffold or edge protection goes up before anyone strips a sheet and WorkSafe is told about any 5 m drop.

  • Closed in every night

    We only strip what we can close in that day, and tarps stay on site in case the weather turns.

  • Price and paperwork in writing

    An itemised quote with GST and a written contract before work starts. At the end you get photos, the warranties and, where one is needed, a record of work signed by our own licensed building practitioner.

Lifespan & Wear

How long Auckland roofs last

The Building Code only asks a roof to last 15 years. BRANZ says metal roofs usually go well past that, depending on the steel, the fixing, the upkeep and the salt.

BRANZ renovation guidance puts asbestos cement roofing at around 50 to 60 years and says many 1940s tiles are at or near the end. Old galvanised corrugate usually goes first at the end and side laps, where dirt and damp sit.

Salt shortens all of it. The warranty on standard roofing steel halves between a moderate site and a very severe one near surf.

Steel & Salt

Choosing steel for the coast

Steel warranties sort sites by distance from the sea. On the east coast, 100 to 500 m from surf, or close to large calm harbour water, counts as severe, and 25 to 100 m is very severe. The bands reach further inland on the west coast.

Under NZS 3604 all of Auckland is zone C or D, and zone D takes in every island and anything within 500 m of the coast, where structural fixings must be stainless. West coast wind pushes the bands further back at Piha and Muriwai.

New zinc and aluminium coated steel must not touch, or sit uphill of, old galvanised steel, and runoff from a different metal eats a new roof. So flashings, fixings and spouting get matched to the roof.

Underlay & Ventilation

What goes under the iron

BRANZ says every profiled metal roof needs an absorbent underlay. Plenty of older Auckland villas and bungalows were roofed without any, and those are the ones dripping onto the ceiling on cold, clear nights.

New underlay sits on mesh or tape, lapped and run down into the spouting. RANZ points out that adding roof space ventilation during a reroof costs far less than doing it later, so we check and price vents if needed.

Consent & Compliance

Do you need a building consent?

Usually not. A roof that kept the weather out for 15 years can be replaced with a comparable roof in the same position under the Schedule 1 exemption. MBIE's own example of exempt work is an old clay tile roof replaced with profiled metal, with the uplift fixings checked against NZS 3604.

A consent is needed when the roof failed inside 15 years, when a light roof is swapped for heavy concrete tiles, or when the pitch, shape or structure changes. If it is borderline, Auckland Council can grant a discretionary exemption, but only before work starts.

Licences & Registration

Who is allowed to do it

When a reroof needs a consent it becomes restricted building work, and an LBP holding the roofing licence must carry it out or supervise it, then sign off a record of work.

Exempt reroofs are not restricted work.

Asbestos & Height

The rules that slow a reroof down

Removing more than 10 m2 of non friable asbestos, which covers almost any asbestos roof, needs a WorkSafe licensed removalist. They must notify WorkSafe at least five days before starting, and a clearance certificate follows the job.

Work where someone could fall 5 m or more has to be notified to WorkSafe 24 hours ahead. If power lines run near the roof, we book the lines company, Vector or Counties Energy in Franklin, to make them safe first.

Insurance & Storms

When a storm brings the roof forward

Insurers pay for sudden damage, like sheets peeled off in a gale, and leave rust and old age to the owner. How much of the roof that covers is the insurer's call, made from a roofer's report and photos.

Tell your insurer before a reroof starts, because some policies and lenders set conditions while the roof is off.

Process & Steps

From the first look to the handover

  1. 01

    Look and measure

    On the roof where it is safe and inside the roof space: purlins, underlay, fixings, ventilation, asbestos risk and distance to the sea.

  2. 02

    Quote and paperwork

    A written quote and contract, the consent or exemption call, asbestos test results, scaffold and the power company booked.

  3. 03

    Strip and close in

    Old roofing off one section at a time, timber fixed, underlay and new roof on, closed in before we leave each day.

  4. 04

    Finish and hand over

    Flashings, pipes and spouting finished and the site cleaned, then photos, warranties and any record of work handed to you.

Costs & Quotes

What a reroof costs

Every reroof is quoted after we have been up on the roof and into the roof space. You get a written, itemised price with GST shown.

What changes the number: roof area and pitch, how many storeys, hips, valleys and chimneys, what is coming off (tiles and stone chip take longer than iron), asbestos testing and removal, rotten purlins or fascia, the steel grade for your zone, scaffold, spouting and flashings, consent fees and disposal.

If rotten timber turns up once the roof is open, we stop and show you before pricing it.

Call out rate: $145 + GST, first 45 minutes on site, travel included in metro Auckland, office hours.

Request a quote

Auckland & Islands

Reroofs from Wellsford to Waiuku

From our Wiri depot we reroof homes in every zone, from City & Isthmus villas and the tile suburbs of Howick & Botany to Takapuna & Albany, Pukekohe & Waiuku and Waiheke & Aotea.

Auckland Council handles building consents and exemptions for the whole region, Gulf islands included.

Island and rural roofs often feed a drinking water tank. We disconnect it before stripping so dust, swarf and old paint stay out, and reconnect it once the new roof has been rinsed.

Owners & Properties

Homes, rentals, baches and solar plans

  • Homes you live in

    You can stay in the house. We only strip what we can close in that day, and tarps stay on site.

  • Solar on the way

    Panels on a tired roof have to come off again later. We reroof first and work with your solar installer on timing.

  • Landlords and property managers

    Reroofs planned around tenants, with the tenant kept in the loop each day.

  • Baches and holiday homes

    The roof replaced while you are away, with photos sent at each stage.

Related & Similar

Related roof and water services

The jobs that go with a new roof.

  • Roof Repairs

    Fixes for roofs with life left in them.

  • Roof Leaks

    Leaks found and storm damage made safe.

  • Flashings

    Chimneys, skylights, walls and valleys.

  • Spouting Replacement

    New spouting, fascia and downpipes.

View all roofing services

Questions & Answers

Reroofing questions

How much does a new roof cost in Auckland?

An honest price needs someone on the roof, because size, pitch, what comes off and the steel grade set it. A single storey iron to long run job sits at the lower end. Tiles, asbestos, two storeys, steep pitches and rotten purlins push it up. Compare quotes line by line, GST included.

How long does a reroof take?

Your quote gives the start date and how long it runs, set by the roof size, the weather and what is coming off. Tile and stone chip conversions need new purlins, and an asbestos roof adds testing, licensed removal and five days notice to WorkSafe.

How long does a steel roof last near the sea in Auckland?

Not as long as the same roof inland, and zone D covers every island and the first 500 m back from the coast. Steel warranties are rated by distance from salt water, and the standard grade is not recommended in the harshest band beside surf.

Do I need a building consent to replace my roof?

Usually not, if the old roof lasted 15 years and the new one is comparable and goes in the same place. You need one if the roof failed early, a heavier roof goes on, or the structure or pitch changes. When it is borderline, we ask the council first.

Can I change from tiles to steel without a consent?

Yes. MBIE's guidance treats replacing an old tile roof with profiled metal in the same position as exempt work when the hold down fixings are checked for wind uplift. If the framing needs substantial replacement, or the roof shape changes, a consent comes back into play.

Does a reroofer need to be a licensed building practitioner?

Only when the reroof needs a building consent, because that makes it restricted building work, and we have our own licensed building practitioner for it. An exempt like for like reroof can legally be done without one. Whoever you hire, check their licence number on the public register.

Will insurance pay to replace my roof after a storm?

It pays for the storm damage, not for wear. Sheets lifted off a sound roof by a gale are usually covered, and the insurer decides how much of the roof that justifies. Rust and old age are excluded as gradual damage. Get the insurer's okay before anything beyond making it safe.

What happens if it rains during a reroof?

We only open up as much roof as we can close in the same day, and tarps stay on site. If heavy rain or strong wind is forecast we hold off, because wet roofs are not safe to work on.

Can I stay in the house while the roof is replaced?

Yes, most people do. Expect noise and some dust in the roof space. RANZ suggests securing pets, and sky dishes and aerials need taking down unless the contract covers them.

What happens if my roof has asbestos?

It is tested first, then either removed properly before the new roof goes on or, in some cases, sealed under an overlay. Almost every asbestos roof is over the 10 m2 limit, so a licensed removalist does the job, WorkSafe gets five days notice and a clearance certificate follows.

My villa is in a special character area. Can I change the roof material?

Like for like is the safe path. Under the Unitary Plan's Special Character rules repair is permitted, but a new material or profile is likely an alteration needing resource consent, and council favours corrugated steel on pre 1940 roofs. Scheduled heritage homes are stricter: closest equivalent material and free standing scaffold only.

Does a new roof need new underlay?

Yes. BRANZ says every profiled metal roof needs an absorbent underlay, and on older homes the old paper is usually torn, brittle or missing. It soaks up condensation from the underside of the steel until it dries, which protects the ceilings and insulation.

Is a long run roof noisy in heavy rain?

Not much once it is finished properly. Underlay and ceiling insulation take out most of the drumming, and RANZ notes acoustic boards help further.

Can you reroof a townhouse block for the body corporate?

Yes. In a unit title block the body corporate looks after roofs and gutters that serve more than one unit, so the committee gets one quote and one report. When the reroof needs consent it is restricted building work, done or supervised by our own licensed building practitioner.

What should a reroof quote include?

Everything that comes off, goes on or gets checked, line by line. RANZ suggests checking scaffold, weather protection, flashings, underlay and timber allowances, disposal, spouting, consent and LBP costs, warranties, who does the work and a written contract. We quote to that list.

Thinking about a new roof?

Send a couple of photos, the age of the house and roughly how far you are from the sea. We come and look, then give you a written quote.