New Build Drainage in Auckland

We lay the sewer and stormwater drains to the public connection on new Auckland builds, set the levels before your slab goes in, test every run, pass the council inspection and lodge the as built, with our in house certifying drainlayer and our own diggers. A new house, a minor dwelling or an extension all get the same treatment.

  • Master Plumbers member logo

    Master Plumbers Member

  • Site Safe member logo

    Site Safe Member

  • Certifying Plumber, Certifying Gasfitter and Certifying Drainlayer

    Certifying Plumber, Gasfitter and Drainlayer

  • Google logo

    Google Rated 4.9

Get help with new build drainage

Overview & Answer

What drainage does a new house in Auckland need?

Every new house needs a sewer drain and a stormwater system, laid by a licensed drainlayer to the consented plan. On serviced land they run to Watercare's sewer and the council's stormwater. Off the network the sewage goes to a treatment system, and roof water to tanks or soakage. Council inspects the drains on test before backfill.

Once it passes, the trenches are filled and council gets an as built plan showing exactly where the pipes went.

Trench or pipe trouble on site? Do this first

  1. Trench wall slumping

    Get everyone out and keep them back from the edge. Nobody climbs into a collapsed or unsupported trench to dig a person out. Call 111.

  2. Gas pipe, cable or unknown service hit

    Stop the digger and treat it as live. Gas smell: no flames or phones near it, move at least 20 metres upwind, call 111, then Vector on 0800 764 764 or the number on the LPG bottle.

  3. Public pipe broken

    Burst water main or sewage spilling from a public line in the berm or street? Ring Watercare on (09) 442 2222.

  4. Sewage in an open trench

    Keep kids and dogs away, wear gloves and boots, and wash your hands afterwards. Do not pump it onto the lawn or into a stormwater sump.

Call 09 873 6671

Scope & Inclusions

  • Sewer drains from the house to the boundary
  • Stormwater from downpipes, paths and driveways
  • Gully traps, vents and inspection points
  • Council drainage inspection booked and attended
  • As built plan signed by a certifying drainlayer
  • Septic tanks and treatment plants on rural lots

Need a different part of the build?

Triggers & Timing

Good times to get a drainlayer involved

The sooner we see the plans, the fewer surprises.

  • Plans being drawn

    We check the connection depths and falls before the floor level is set in stone.

  • Consent just granted

    Book the drains now. Good drainlayers fill up weeks ahead, and the slab will not wait.

  • Site cut finished

    The pad is down and the builder wants drains in before the boxing goes up.

  • The plan does not fit the ground

    The stub is shallower than drawn, or rock turns up where a pipe should go.

  • Rural lot, no services

    Septic, soakage and tank overflows all have to be planned around the house.

  • Drainlayer gone quiet

    We check and test what is already in the ground, then pick it up from there.

Drains & Systems

The drainage systems on a new build

Most houses need two or three of these. Your consented plan says which.

  • Sewer drain

    Takes toilets, showers, the kitchen and the laundry out to the Watercare connection, through a gully trap and inspection points.

  • Stormwater drain

    Carries roof, path and driveway water to the public stormwater pipe, a tank or soakage, as your consent sets out.

  • Soak pits

    Where there is no public stormwater, roof water soaks back into the ground, if a test shows the ground can take it.

    Soak pits
  • Detention tank

    Holds storm runoff from the new roof and paving, then lets it out slowly through a small outlet.

    Detention tanks
  • Septic or treatment plant

    Rural lots treat their own wastewater, to a design done for that site.

    Septic tanks
  • Pump chamber

    If the house sits below the sewer, a pump lifts the wastewater up to it.

    Pump stations

Proof & Promise

Why builders and owners call Taylor for new build drains

  • Certifying drainlayer

    Our in house certifying drainlayer signs every job off, and a new home build carries the Master Plumbers Guarantee: 12 months, up to $20,000 incl GST.

  • Levels checked before the slab

    We find the Watercare stub, measure its depth and confirm the falls work before your designer or builder locks in the floor height.

  • Your programme, not ours

    We book the drains around the site cut, the slab pour and the scaffold, and confirm the day before we arrive.

  • Tested, photographed, then covered

    Every run is held on test for the council inspector and photographed before any fill goes back, and you get the photos.

  • One quote for the whole job

    Pipes, digging, spoil carted away, soakage or tanks and the as built, priced together, with any Watercare work shown as its own line.

  • 24/7 when a site goes wrong

    A digger through a pipe or a new drain backing up gets a person on the phone and a crew out, day or night.

Plans & Consent

The drainage plan is part of your building consent

Your designer draws the drains on the consent plans: pipe routes, sizes, the gully trap, inspection points and where the sewer and stormwater end up. We lay to that plan, and the inspector checks against it.

Ground does not always match the drawing. If a pipe has to move, council approves the change before the trench is filled. In one Christchurch case, MBIE overturned a code compliance decision because a drain on a new house leaked.

Drainlaying, stormwater included, is restricted work. Only a licensed drainlayer, or someone supervised by a certifying drainlayer, may do it. Check any name on the public register.

Inspection & Approval

How Auckland Council signs off the drains

Council inspects the drains uncovered and holding a test. Inspections run 8am to 4pm on weekdays, next day bookings close at 1pm, and a cancellation after midday the day before is charged in full, so we book early and turn up.

The as built goes in for your code compliance certificate, with Watercare's certificate for the sewer connection. Our certifier is endorsed for the PGDB self certification scheme, so eligible consented work can be certified without a council inspection.

Council & Connections

Who joins your drains to Watercare's network

Your private drain runs to the point of supply. For a simple gravity connection to an existing stub, Watercare confirms a licensed drainlayer can make it: we apply, allow up to 10 working days for approval, give two working days notice, connect, and report completion within a working day.

Watercare then issues its Certificate of Acceptance once our compliance statement is in. Pressure sewer, vacuum systems, isolations and anything on the water main side are done by Watercare's own contractors, and our quote says so.

Levels & Falls

Why the floor height starts at the boundary

Drains only work downhill. A 100 mm house drain needs a fall of at least 1 in 60, about 17 mm for every metre, laid at an even grade all the way. Measure back from the depth of the Watercare stub and you get the lowest your gully trap and floor can sit.

The gully trap rim has to sit at least 150 mm below the overflow of the lowest fixture, and above the ground around it: 25 mm over paving, 100 mm over lawn or garden. That way a blocked sewer spills outside, not into your shower.

Branch drains longer than 10 m need their own vent, so we flag those at plan stage.

Rain & Runoff

Where the roof water goes

On a serviced lot, stormwater goes to the public pipe through a connection approved inside the building consent. With no public pipe, it goes to soakage, which has to pass a test at that spot, above the winter water table.

A new roof and driveway shed water faster than bare ground. In a SMAF 1 or 2 area, more than 50 square metres of new hard surface brings retention and detention under the Unitary Plan, and your consent conditions may add more. We work through it with you, or with your engineer where the consent calls for one.

Rural & Onsite

Septic and treatment plants on a new build

Off the sewer network, a suitably qualified designer assesses the soil and slope and designs the wastewater system, including a reserve area. New permitted systems in Auckland need at least secondary treatment, and the Unitary Plan's E5 rules decide whether the discharge also needs a resource consent.

We install the tank or plant, the drain to it and the field, and keep roof water out of it. Choose early, as a treatment plant needs power and truck access for servicing.

Sequence & Coordination

Fitting the drains into the build

Most outside drains go in after the site cut, around the slab pour, before scaffold and the driveway block access. The plumber's under slab pipes meet ours at the foundation edge, so we agree those exit points together.

Every dig starts with a beforeUdig request, lodged two full business days out. Trenches over 1.5 m deep are shored, and notified to WorkSafe when the rules require it.

If a Watercare pipe crosses the section, building within 2 metres of it needs Works Over approval before you build.

Process & Steps

From plans to as built

  1. 01

    Send the plans

    Consent drainage plan, site plan, address and where the build is at. Rural lots: the wastewater design too.

  2. 02

    Levels and price

    We locate the stub, check depths and falls, then give you a written price with GST and the council fees shown separately.

  3. 03

    Dig, lay, test

    Drains go in to your builder's dates, held on test, photographed and inspected by council before any backfill.

  4. 04

    As built and hand over

    Trenches filled, spoil gone, the as built signed and lodged, and a copy with photos sent to you.

Costs & Quotes

How new build drainage is priced

We price from your plans and a site look, in writing with GST. A flat town lot with stubs at the boundary is a short job; a sloping rural block with septic and rock is not.

The price moves with the length of pipe, the depth of the stub, rock or hard clay, the number of gully traps and inspection points, soakage or detention, a pump chamber, any treatment system, reinstatement and travel.

Consent fees and Watercare's connection and growth charges are set by the council and Watercare, listed on their own lines and never folded into our price. Once the levels are confirmed the price is fixed in writing.

Request a quote

Auckland & Islands

New build drainage around Auckland

Auckland Council consents and inspects the drains, Watercare runs the sewer your house joins, and Healthy Waters runs public stormwater. Ground changes fast: basalt on the isthmus, heavy clay in the south and west, peat around Takanini. Pressure sewer areas such as Kumeu, Huapai and Riverhead need a boundary kit and a pump unit.

From our Wiri depot we lay drains on new builds across every zone on our locations page, from infill in City & Isthmus to new subdivisions in Hobsonville, Flat Bush, Drury and Pukekohe, with travel outside metro Auckland quoted first.

Watercare: connecting wastewater pipes

Clients & Sectors

Builders, owner builders and families adding a dwelling

  • Builders and group builders

    We work to your site rules and dates, and send the photos and as built straight to your site manager.

  • Owner builders

    We tell you what must be ready before we arrive and who books which inspection.

  • Granny flats and minor dwellings

    The levels decide whether it joins your drains or needs its own.

  • Extensions

    New drains tie into the old ones, which we film first if they look tired.

Related & Similar

Related drainage and build services

Plumbing inside the house, sewer connections, stormwater and rural wastewater each have their own page.

View all drainlaying services

Questions & Answers

New build drainage questions

How much does drainage for a new house cost in Auckland?

The section sets the price more than the house. Pipe length, stub depth, rock, stormwater disposal and any pump swing it. Send the plans for a written price with GST, and council and Watercare charges shown separately.

When does the drainlayer start on a new build?

Usually straight after the site cut, around the time the slab goes in. Book us before that, because the levels we take decide how low the floor can sit. The drains then stay open until council has inspected them.

Do I need a plumber or a drainlayer for a new house?

Both. The plumber does the pipes inside and under the house. The drainlayer takes over at the foundation and lays everything outside. We have both trades on one team, so the hand over point is agreed before anything is dug.

What if the drainage plan does not suit the site?

We raise it before we dig. A shallow stub, rock or a changed floor height can force a new route. Council must accept the change before the drain is covered, so we sort it with your designer first.

What fall does a house drain need in New Zealand?

Under the Building Code's acceptable solution, at least 1 in 60 for a 100 mm drain, which is about 17 mm of drop per metre. Smaller pipes need steeper falls, such as 1 in 40 for 65 mm. The fall has to be even, with no dips where waste can settle.

How high does a gully trap need to be?

Its rim must be at least 25 mm above paving or 100 mm above lawn and garden, and at least 150 mm below the overflow of the lowest fixture inside. It must be inside your boundary, with surface water kept out, so a backed up sewer overflows outdoors.

What does Auckland Council check at the drainage inspection?

The inspector looks at the pipes before they are covered, with the drains holding a test, and checks them against your consented plan. Watercare checks the sewer connection through its own process, and the as built goes in for your code compliance certificate.

Who signs the as built drainage plan in Auckland?

For private drains, Auckland Council accepts a plan drawn by the drainlayer who did the work, showing where the pipes went, their sizes and connections. Ours are prepared under our certifying drainlayer. Pipes that will vest need a surveyor or chartered engineer instead, and your copy saves digging blind later.

Can you connect my new house to the Watercare sewer?

Yes, to the stub. We lay and test the private drain and connect it to the Watercare stub ourselves, which a licensed drainlayer may do for a simple gravity connection once Watercare approves it. Pressure sewer, a rising main or other complex work goes to Watercare's own contractor.

How do I find the drain connection on my section?

Start with the property file and the Watercare connection details for the lot, and check GeoMaps for public pipes nearby. On site we confirm the stub by probing or hand digging before the floor level is set.

Do I need a stormwater detention tank for a new house in Auckland?

Only if your site or consent calls for one. In a SMAF 1 or 2 area, more than 50 square metres of new roof and paving brings retention and detention rules, and some resource consents set a tank as a condition. Your consent documents usually say.

Can the roof water go into a soak hole in Auckland?

Yes, where there is no public stormwater and the ground passes a soakage test at that spot. Basalt and scoria on the isthmus often pass, while clay, tuff and ash usually fail, which can push you to tanks or a pipe to the network.

What will Watercare charge for the new connection?

From 1 July 2026, a new home in metro Auckland carries Watercare's Infrastructure Growth Charge of $29,348.46 incl GST, and a 20 mm meter on a new service lead is $2,045.22. Other areas have their own growth charges. Watercare bills these directly, and they are never part of our price.

Does a granny flat need its own drains?

Often it can branch off your existing drains, if the levels and pipe size allow. Under the 70 square metre granny flat exemption there is no building consent, but the drainlaying still has to be done by a licensed drainlayer, so keep the paperwork.

Does council always inspect new house drains?

Not any more. Under MBIE's self certification scheme, an endorsed certifier can certify eligible consented work on buildings up to three storeys, and the council does not inspect it. Our certifier is endorsed. You get a certificate of compliance within 10 working days. Apartments and drains serving public infrastructure are excluded.

Drains for your new build in Auckland

Send the drainage plan and tell us where the build is at. We check the levels, give you a fixed written price and fit the drains to your builder's dates.