New Build Plumbing in Auckland

Our plumbers, gasfitter and drainlayer do every wet trade on a new Auckland build: under slab, rough in, fit off, hot water, gas, drains, water supply and the sign off paperwork. An infill townhouse or a lifestyle block, we cover both.

We work for builders, group home builders, owner builders and developers, and we book our visits around your programme. Our in house certifying plumber signs off, and home workmanship carries the Master Plumbers Guarantee, up to $20,000 including GST.

  • Master Plumbers member logo

    Master Plumbers Member

  • Site Safe member logo

    Site Safe Member

  • Certifying Plumber, Certifying Gasfitter and Certifying Drainlayer

    Certifying Plumber, Gasfitter and Drainlayer

  • Google logo

    Google Rated 4.9

Get help with new build plumbing

Overview & Answer

What does a plumber do on a new build?

A new build plumber installs the water, waste and hot water pipes in three main visits: under slab before the concrete goes in, rough in while the framing is open, and fit off once linings and finishes are done. Each stage is tested before it gets covered, and Auckland Council inspects at set points along the way.

Around that sit the gas pipe, the drains, the Watercare connection or tank supply, and the certificates for your code compliance certificate. We cover all of it, so one company answers for everything wet on your build.

Pipe or service hit on site? Do this first

  1. Water pouring from a cut pipe

    Close the valve in the meter box at the boundary, or switch the pump off on a tank site. Public pipe in the street or berm? Ring Watercare on (09) 442 2222, any hour.

  2. Gas pipe hit or gas smell

    Stop the machines, no flames, no phones near the smell. Move everyone upwind, call 111 from a safe distance, then Vector on 0800 764 764, or the number on the LPG bottle.

  3. Cable or unknown pipe

    Treat it as live. Keep people and the digger clear and call 111 if anyone is hurt.

  4. Water through a finished house

    Shut the water at the boundary and switch the cylinder off from a dry spot. Ring us and your builder, and take photos for the insurer.

Call 09 873 6671

Scope & Inclusions

  • Plan review and fixture set outs
  • Rough in of water, waste and vent pipes
  • Hot water cylinders, heat pump water heaters and gas califonts
  • Drains to the boundary, sewer or septic tank
  • Fit off of tapware, toilets, showers and appliances
  • Producer statements, gas certificates and as built plans

Looking for one part of the job?

Triggers & Timing

The right time to ring us

Earlier is cheaper. These are the usual points.

  • Plans still on the drawing board

    We spot a long hot water run or a toilet with no room for fall before council sees the plans.

  • Slab booked

    Under slab wastes must be in, tested and passed before the concrete truck turns up.

  • Frame up and roof on

    Rough in time. We need the final tapware and toilet models now.

  • Your plumber has pulled out

    We check and test what is already in, then carry on from there.

  • Rural section, no Watercare supply

    Tank, pump and wastewater get planned with the house.

  • A leak after you move in

    Put it in writing to your builder, or to us if you hired us.

Stages & Timing

Under slab, rough in and fit off

Most new homes get three main plumbing visits, then commissioning and hand over.

  • Under slab

    Wastes for the toilets, showers, basins and kitchen are laid to the plan, set to fall and left full of water for council's check. Water pipes through concrete go in sleeves.

  • Rough in

    With the frame up, we run hot and cold, waste, vent and gas pipes, fix the mixer bodies and hold everything under pressure for the pre line inspection.

  • Fit off

    After linings, tiling and cabinetry, we fit tapware, toilets, basins, showers, the sink and appliance connections, then start the hot water.

  • Commission and hand over

    We flush the lines, check flow, tap temperature and every joint, then hand over the paperwork.

Proof & Promise

Why builders and owners use Taylor on new builds

  • Every wet trade under one roof

    A certifying plumber, gasfitter and drainlayer in house, and we are Master Plumbers members. The Master Plumbers Guarantee covers our workmanship in a home for 12 months, up to $20,000 including GST. We guarantee the workmanship for life; the maker warrants the parts.

  • We turn up when the programme says

    Stage dates are locked in with your site manager at the start, and we confirm the day before each visit.

  • Tested and photographed before cover

    Every pipe run is pressure tested and photographed before linings, and you get the photos.

  • Set up for group builders

    We work to your set out sheets, subcontract terms, site rules and claim cycle, with insurance certificates on file.

  • 24/7 when a site needs it

    A pipe cut by a digger or a leak at fit off goes to our 24/7 roster, and your site gets an arrival time before a plumber leaves.

  • Paperwork that does not hold up your CCC

    Producer statements, gas certificates and warranty registrations arrive at hand over, not weeks later.

Council & Inspections

What Auckland Council checks on the plumbing

A typical house has four inspections that involve our work. Under slab plumbing is checked for layout, materials and fall while the pipes hold water. At pre line, the hot and cold pipes are inspected under pressure. Drains are inspected before trenches are backfilled, and the final checks hot water temperature and collects the paperwork.

The consented plans must be on site. Missing paperwork fails the inspection, and the council lists $195 per Residential 1 inspection and $222 for a same day cancellation (fee page, November 2026). A national target now has councils completing at least 80 percent of inspections within three working days of the date asked for, and we still book ahead.

Records & Certificates

Producer statements, records of work and as builts

Records of work come from Licensed Building Practitioners, usually your builder and designer. Plumbing is not restricted building work, so plumbers are not LBPs. From us you get producer statements for the water pressure test and the drain test on Auckland Council's PS3 forms, plus the gas certificates.

The drainlayer gives council a drainage as built plan at the drainage inspection.

You apply for the code compliance certificate when the work is finished, and the council has 20 working days to decide once it has everything. Built near public pipes? It also wants Watercare's sign off first.

Defects & Warranties

What the Building Act gives you after hand over

Every home build carries implied warranties under the Building Act: work done to the consented plans, with suitable materials, to the Building Code, with reasonable care and in a reasonable time. They last up to 10 years, written contract or not.

The first 12 months after completion are a defect repair period. On a builder led job you notify the main contractor in writing, and they organise the fix even when a subcontractor caused it.

At completion the contractor must hand over insurance on the work, product warranties and maintenance information. Ours come with cylinder and tapware warranties already registered.

Cylinders & Sizing

Choosing and sizing the hot water

Settle the system before rough in. A heat pump, a gas califont and an electric cylinder each need different pipes, power and floor space. Put it near the bathrooms and kitchen so hot water arrives quickly and less heat is lost in the pipes.

Stored water is kept at 60°C or more to control legionella, while new bathroom fixtures in a home get water no hotter than 50°C. We fit a tempering valve wherever the system needs one.

Water & Drains

Getting connected to Watercare

Watercare's contractors supply the meter and service lead for a new home, and Auckland Council wants Watercare's Certificate of Connection before it issues the code compliance certificate.

Watercare normally provides at least 200 kPa at the meter. A house with an irrigation meter or fire sprinklers needs a testable backflow device at the boundary.

Building within 2 m of a local public pipe, or 10 m of a critical one, needs Watercare's approval with CCTV before and after, so find out where public pipes run before the plans are final.

Pipework & Timing

Gas goes in with the frame

Gas pipe to a hob, califont or fire goes in at rough in alongside the water pipes. Decide early between piped natural gas and LPG bottles, and where the meter or bottles sit, because the gas truck needs a clear path.

Vector quotes about 6 to 8 weeks from payment for a simple new connection, charges full cost with a $350 incl GST assessment fee, and forecasts new connections stopping in its 2029 year. Once connected you get a gas safety certificate within 20 working days and a certificate of compliance.

Rural & Builds

Tank water, pumps and septic out of town

Off Watercare's network, in rural Rodney, Franklin and on the islands, the roof feeds a tank, a pump pushes water to the house and treatment makes it safe to drink. A household supply serving 25 people or fewer does not register with Taumata Arowai, so getting it right falls to you and your plumber.

Drinking water tanks must meet AS/NZS 4020. Where your consent asks for firefighting water, SNZ PAS 4509 sets the amount, on top of household storage. We plan the tank, pump, filters, UV and wastewater system with the house.

Process & Steps

From plans to hand over

  1. 01

    Send us the plans

    Plans, fixture schedule, address and where the build is at.

  2. 02

    Written quote by stage

    Priced stage by stage, GST included, naming the plan version and what is left out.

  3. 03

    Stages to your programme

    Dates agreed with the site manager, each stage tested, inspections booked or confirmed and photos sent.

  4. 04

    Fit off and hand over

    Everything commissioned and checked, with producer statements, certificates, manuals and warranties in one pack.

Costs & Quotes

How new build plumbing is priced

There is no set price for a new house. A one bathroom cottage on Watercare mains and a two storey home on tank water with a heat pump are nothing like the same build, so we price from your plans and fixture schedule.

The quote breaks out each stage, the hot water, gas, drains, the water connection or tank supply, any fixtures we supply, testing, paperwork, travel and GST. Allowances are marked as allowances.

Bathrooms and storeys, long pipe runs, gas, pumps and treatment, distance, extra visits when a stage is not ready and plan changes after rough in all move the price. Council fees, Watercare's connection and growth charges and Vector's charges are set by others and never folded into our price. Changes are priced and agreed in writing first.

If you hire us directly for residential building work of $30,000 or more including GST, the law requires a written contract, and you get a disclosure statement and checklist before you sign. On a builder led job we are usually the builder's subcontractor, named in the builder's contract with you.

Request a quote

Auckland & Islands

New builds around Auckland

Auckland Council runs building consents and inspections across the region, Watercare runs water and wastewater, and Healthy Waters looks after public stormwater. Many infill sites also sit in a stormwater management area, which can mean an onsite detention tank.

Each new home pays Watercare's growth charge, $29,348.46 incl GST per unit in the metropolitan area from 1 July 2026, and more in Helensville, Wellsford and other outer areas. We plumb new builds in every zone, with rural and island travel confirmed first.

Areas we cover

Clients & Sectors

Builders, owner builders and developers

  • Builders

    We work to your programme and site rules and keep our side of the inspection diary.

  • Group home builders

    Standard plans mean repeatable pricing across several sites at once.

  • Owner builders

    You carry the coordination a builder normally does. We spell out what must be ready before each visit and which inspections are ours to book.

  • Developers

    Townhouses and subdivisions need plumbing and connections lined up with the civil works. We price per unit and stage.

Related & Similar

Related new build services

Drains, hot water, gas and rural water each have their own page.

View all plumbing services

Questions & Answers

New build plumbing questions

How much does new build plumbing cost in Auckland?

There is no set price, so send the plans and fixture schedule for a stage by stage price, GST included. A one bathroom home on Watercare mains costs far less than a two storey house with gas and a tank.

When should a plumber be brought into a new build?

Before the plans go in for consent, ideally. That is when moving a bathroom or grouping wet areas costs nothing. At the latest, book us before the slab, since under slab wastes go in, get tested and get inspected before the pour.

What is the difference between rough in and fit off?

Rough in is the pipework fitted while the walls are open, and fit off is fitting taps, toilets and fixtures once the walls are finished. Rough in is pressure tested and inspected before linings. Fit off comes after tiling, paint and cabinetry.

What plumbing inspections does Auckland Council do on a new house?

Usually four: under slab plumbing, pre line with the pipes under pressure, drainage before backfill, and the final. Your consent sets the exact list. A timber floored house has no under slab check, and eligible work self certified by an endorsed plumber under the national scheme can skip the council inspection.

Who books the council inspections on a new build?

We do. We book every plumbing, gas and drainage inspection with Auckland Council a day or two ahead, with the consent number, address and a site contact, and line the dates up with your builder at the start.

What plumbing paperwork is needed for the code compliance certificate in Auckland?

Producer statements for the water and drain tests, gas certificates and the drainage as built plan. The council collects these, with the electrical certificates and Watercare's Certificate of Connection, at the final.

Does the plumber give a record of work?

Not on a consented house. Records of work come from Licensed Building Practitioners doing restricted building work, and plumbing is not restricted building work. The exception is a granny flat built under the exemption, where the council asks for a record of the sanitary plumbing and drainlaying when it is finished.

What does Watercare charge to connect a new house?

From 1 July 2026, incl GST: $2,045.22 for a 20 mm meter and new service lead, $988.71 for a meter on an existing lead and $258.89 for wastewater connection approval, plus the growth charge per new unit. Those are Watercare's charges, set out in its schedule, never part of our price.

What happens if the plumbing fails a council inspection?

The inspector lists what needs fixing, the work is put right, and the inspection is booked again, which costs extra. Missing paperwork or plans not on site are the usual trip ups, so we have both ready.

How long does a Watercare water connection take?

Allow a few weeks. Watercare's invoice comes in about 10 days, and its contractor installs the meter and lead about 15 working days after you pay. You need the Certificate of Connection for the code compliance certificate, so we prompt you to apply once consent is through.

Do you plumb townhouse and terrace developments?

Yes. Each unit's water, waste and gas has to line up with the civil works and any stormwater detention, plus a meter and growth charge per unit. We price per unit and stage, and work owner builders and group builders through the same checklist.

Can I supply my own tapware and fixtures?

Yes, if we know the exact models before rough in. Concealed mixers and in wall cisterns set pipe positions, so a late swap can mean opening a wall.

Who fixes a plumbing defect after we move in?

Your builder if they hired us, or us if you hired us directly. Report it in writing within 12 months of completion and it must be fixed within a reasonable time.

Do you do the gas, drains and stormwater on a new build too?

Yes. Our gasfitter lays and certifies the gas pipe, and our drainlayer lays and tests the sewer and stormwater drains, with our own diggers. A licensed drainlayer can connect a simple gravity sewer stub with Watercare's approval; water main work is done by Watercare's contractors.

Can you plumb a granny flat under the 70 square metre exemption in Auckland?

Yes. Since 15 January 2026, a single storey standalone home of up to 70 square metres can skip consent if every condition is met and the council has issued a project information memorandum. Ask Watercare whether its growth charge applies. A level entry shower needing a membrane rules it out, and council does not inspect.