Supply & Pipework

Gas Line Installation in Auckland

A new cooktop in the kitchen, a califont on the back wall or a BBQ point on the deck all need pipe first. We install, extend, move and replace gas pipe right across Auckland, on LPG bottles or Vector natural gas, from a short tee off to a long run under the lawn, signed off by our in house certifying gasfitter.

We size the pipe for everything you plan to run, pressure test it and leave you the certificates. Hit a pipe or smell gas? Read the safety box first.

  • Master Plumbers member logo

    Master Plumbers Member

  • Site Safe member logo

    Site Safe Member

  • Certifying Plumber, Certifying Gasfitter and Certifying Drainlayer

    Certifying Plumber, Gasfitter and Drainlayer

  • Google logo

    Google Rated 4.9

Get help with gas lines & pipework

Overview & Answer

Who can install a gas line at my place?

Only a licensed gasfitter, with the work signed off by a certifying gasfitter. Running, extending or moving gas pipe is gasfitting under New Zealand law, and adding to an existing system counts as high risk work. You get a gas safety certificate and a certificate of compliance, and high risk jobs are recorded with WorkSafe.

Hit a gas pipe or smell gas? Do this first

  1. Smell gas

    If you can reach the meter or bottle valve safely, turn it off. Keep flames, smokes, light switches and phones away from the smell. Throw the doors and windows open and get everyone out.

  2. Who to call

    From at least 20 metres away, ring 111 if the smell is strong, something is burning or a person feels unwell. Natural gas: ring Vector, 0800 764 764. LPG: the emergency number on the bottle tag or your gas bill. Then give us a ring.

  3. Dug, drilled or cut into a pipe

    Stop work and keep people back and upwind. Do not try to plug, tape or bury the pipe. A Vector pipe gets 111 and Vector on 0800 764 764. On your side of the meter or on bottles, isolate the supply if it is safe to reach.

  4. Gas back on after a repair

    Leave the valves shut once a line has been cut or opened. A certifying gasfitter has to be part of turning the gas back on, so the air is purged and every appliance relights properly.

Call 09 873 6671

Scope & Inclusions

  • New gas lines to cooktops and ovens
  • Lines for califonts, fires and heaters
  • BBQ, patio heater and fire pit points
  • Gas points moved in renovations
  • Underground runs from bottles or the meter
  • Gas certificates and WorkSafe records

Need something else?

Triggers & Timing

Gas pipe jobs we get asked about

Tell us what you want to run, where it is going and whether you are on bottles or a meter.

  • New appliance, no gas there yet

    A hob on the island, a califont on the far wall or a heater in a room that never had gas.

  • Kitchen or bathroom being redone

    The gas point has to shift before the linings and benchtop go back on.

  • BBQ or outdoor kitchen

    A fixed point off the house supply, so nobody is lugging 9kg bottles to the deck.

  • Flames drop when everything runs

    The hob goes weak when the califont fires. Usually the pipe was never sized for what got added later.

  • Rust on old pipe

    Flaking steel under the floor or along an outside wall, sometimes with a smell nobody can pin down.

  • Bottles moving or a meter coming in

    A new bottle spot or a new Vector meter means new pipe back to the house.

Pipes & Materials

What your gas line is made of

Where the pipe runs decides what it is made of. The gas standard and the maker's manual set the limits; these are the usual choices.

  • Copper

    The standby inside walls and above ground. It is brazed or joined with press fittings made for gas, which carry a yellow seal. They pair with copper tube made to NZS 3501.

  • Multilayer pipe

    PEX with an aluminium core, made for gas. Fast through framing with few joints. The maker's NZ manual wants trained installers, no sunlight on the pipe, and any run outside the house kept underground.

  • Polyethylene

    Yellow PE for long buried runs from the bottles or the meter. It comes out of the ground through a metal riser and is never left lying on top.

  • Steel

    Found in older homes and commercial buildings. Strong, but it rusts where it is buried, damp or close to the sea, so it is often what we end up replacing.

Proof & Promise

Why call Taylor for gas pipework?

  • Certifying gasfitter in house

    Sign off comes from our own certifying gasfitter, on every job. As Master Plumbers members, our home work carries the Master Plumbers Guarantee of 12 months and up to $20,000 incl GST. Our labour is guaranteed for life; parts carry the maker's warranty.

  • Every pipe type

    Copper, polyethylene and steel runs and repairs, and multilayer only by a gasfitter trained on that maker's system.

  • We dig it ourselves

    Our own diggers and hydro excavation, buried services located first, bedding, marker tape and the lawn or path put back.

  • Sized on paper first

    We work out the load and the run before we buy pipe, so the line is sized for everything on it.

  • 24/7 for damaged pipe

    Digger strikes and pipe leaks get a gasfitter day or night, after 111 and the network have been called.

  • Plumbing and gas together

    On a reno or new build, the same team runs the water and the gas, so one booking covers both.

Certificates & Paperwork

Paperwork for every metre of pipe

WorkSafe sorts gasfitting into three risk classes. A brand new installation is general gasfitting, and an addition or alteration to an existing installation is high risk. Both need a certificate of compliance, and the job does not count as finished until that certificate is issued.

Every job also gets a gas safety certificate once the gas is connected, with up to 20 working days to reach you. High risk work goes on WorkSafe's electricity and gas high risk database within 20 working days of the certificate.

If a gasfitter is not satisfied a line is safe, the regulations say it must be disconnected from the gas on the spot.

Sizing & Capacity

Big enough for everything on the line

Gas pipe is sized on the total load and the length of the run. Califont manuals say to size the supply for the heater plus every other gas appliance in the house.

Load is counted in megajoules an hour. A big califont can pull about 199 MJ an hour at full flow, while a 9kg bottle gives only about 19. A line that ran a hob and a heater happily for years can starve once a califont goes on the end.

We add up what you run now and what you might add, then size the pipe, the regulator and the bottles or meter to suit.

Underground & Depth

Burying a gas line

Long runs from a bottle station, shed or meter usually go underground in polyethylene. The depth comes from the joint gas standard. That means 450 mm of cover where vehicles drive and 300 mm in other ground and rock, with marker tape laid over plastic pipe.

Where plastic pipe reaches the house, the 2022 edition has it finish at least 300 mm below ground and join a metal riser.

Vector has its own spec for the service pipe it lays to your meter: 450 to 1,200 mm of cover inside the boundary, 150 mm of sand, marker tape above it and 250 mm clear of other services. Before we dig, we ask for the free plans of buried services at least two full business days ahead.

Walls & Slabs

Through walls, floors and concrete

Pipe through a wall, floor or slab needs room to move and protection. Copper through walls and floors must be free to move, and the multilayer pipe manual recommends jacketing pipe that touches concrete and wrapping buried fittings.

On a new slab we lay the gas sleeve before the pour. Cutting concrete for it later costs far more.

Stages & Timing

Get the pipe in at the right stage

Gas is easiest to run while the framing is open. On a new build we rough in the gas with the water pipes, test it, then connect the appliances at fit off. MBIE says energy work certificates go in with your code compliance application at the end.

Doing a kitchen? Give us the hob model and position early. Shifting a gas point after the benchtop is in means more cutting and more cost.

WorkSafe says new gas installations started after 12 November 2026 must meet one of the newly cited standards, so we check which edition applies before work begins.

Process & Steps

From first call to certificate

  1. 01

    Tell us the plan

    What you want to run, where it goes, bottles or meter, and photos of where the gas is now.

  2. 02

    Site check

    We walk the route, look under the floor, check for buried services and add up the load.

  3. 03

    Written quote

    Pipe type, metres, trenching, wall or slab work, testing, certificates and GST shown. Anything extra waits for your yes.

  4. 04

    Run, test, certify

    We lay it, pressure test it, purge it, light every appliance and hand over the certificates.

Costs & Quotes

How a gas line is priced

Gas pipe has no set price: a two metre tee off under the floor and a forty metre trench to a shed are different jobs. Send photos and the appliance details and we quote it in writing.

The quote lists labour, pipe and fittings by type and length, trenching and reinstatement, any wall, floor or slab penetrations, the regulator or bottle work, testing, certificates, travel and GST.

It costs more with a long run, hard rock, concrete to cut, tight access under the house or old pipe that must come out before the new section can be certified.

Call out rate: $145 + GST, first 45 minutes on site, travel included in metro Auckland, office hours.

Request a quote

Auckland & Islands

Gas pipework across Auckland

Vector pipes natural gas through most of urban Auckland, while the islands and many rural properties run on bottled LPG. Ground varies a lot here, from basalt on the volcanic field to clay and fill on newer subdivisions, so we check before we price a dig.

Townhouse and terrace builds add their own puzzle of slabs, shared walls and tight side yards, so pipe runs are planned before the concrete goes down. All of Auckland is corrosion zone C or D, which is hard on old steel near the coast. The vans work every zone from Wiri, and island travel is confirmed before we book.

Vector new gas connections

Customers & Properties

Homes, renovators, builders and landlords

  • Homeowners

    A new appliance, a moved hob or a line out to the deck, planned so it suits whatever you add next.

  • Renovators and kitchen companies

    Gas points marked off the plans, roughed in on time and connected once the cabinetry is in.

  • Builders

    Gas roughed in with the plumbing, sleeves set before the pour and certificates ready for code compliance.

  • Landlords and property managers

    Old pipe found on a check replaced and certified, with tenant access sorted and the certificates sent to you.

Related & Similar

Related gas services

The appliance, the supply and the safety check each have their own page.

View all gasfitting services

Questions & Answers

Gas line questions

How much does it cost to run a gas line in Auckland?

It comes down to the length of the run, the pipe type and what is in the way. A short extension under a timber floor is a small job; a trench across the section or through rock is a big one. We quote in writing after seeing the route, with GST shown.

Can I install my own gas line?

No. Running, extending or connecting gas pipe is gasfitting, and only a licensed gasfitter may do it, with a certifying gasfitter signing it off. The Plumbers, Gasfitters and Drainlayers Board prosecutes unlicensed work, and an uncertified line can leave you uninsured. You can check any gasfitter on the PGDB public register.

What pipe is used for gas lines in New Zealand?

Mostly copper and multilayer inside, polyethylene underground and steel in older or commercial buildings. Copper is joined by brazing or gas rated press fittings, multilayer uses its maker's own fittings, and buried PE comes up through a metal riser.

Can PEX pipe be used for gas?

Yes, multilayer PEX with an aluminium core made for gas is certified to AS 4176.8. It is not ordinary PEX water pipe. The installer needs the maker's training, the pipe must be shaded from sunlight, and WorkSafe notes the 2022 standard does not allow multilayer above ground outside a building.

How deep does an underground gas line need to be in Auckland?

450 mm of cover under driveways and 300 mm elsewhere and in rock under the joint gas standard, with marker tape above plastic pipe. Vector's spec for its own service pipe is 450 to 1,200 mm of cover. Your certifying gasfitter confirms the figure for your job.

Does a new gas line need a certificate?

Yes, two. Every gas job gets a gas safety certificate once connected, and new installations or additions also need a certificate of compliance. Extending an existing system is high risk work, so it is logged on WorkSafe's high risk database too. Keep both for insurers, buyers and the next gasfitter.

Do I need a building consent for a new gas line?

Usually not for the gasfitting on its own, which is signed off with gas certificates as energy work. When the pipe is part of consented work like a new build or an extension, the gas certificates go to Auckland Council with the code compliance application. Cutting through a fire rated wall or structure can be building work, so we check first.

How long does it take to put in a gas line?

It depends on the route: a short extension inside the house is the quickest job, test and relight included. Underground runs, slab work and new builds take longer because of digging, beforeUdig notice and other trades. We give you a time on the quote once we have walked the route.

Can you run a gas line out to my BBQ?

Yes. We extend the house supply to a fixed bayonet or hard connection on the deck or outdoor kitchen, sized so the BBQ does not starve the califont. A bayonet must be fitted by a licensed gasfitter, and a BBQ bottle regulator must not be used on a house supply.

Why do my gas appliances go weak when another one is on?

Usually the pipe or regulator is too small for everything on it at once. A califont uses far more gas than a hob, so pressure drops when the shower runs. An empty bottle or a failing regulator does it too. We measure it to find which.

Should old steel gas pipe be replaced?

If it is rusting, leaking or will not pass a test, yes. Steel buried in damp ground or exposed to salt air corrodes from the outside in, often where nobody can see it. Sound pipe can stay. We test it and show you what we find before quoting.

Who owns the gas pipe on my property?

On natural gas, Vector lays and looks after the service pipe from the street up to and including the riser at your meter, and the pipe from the meter outlet to your appliances is yours. On LPG, the supplier owns the bottles and you own the regulator, pigtails and pipework. Your side is the part a gasfitter installs and certifies.

What happens if I hit a gas pipe while digging?

Get everyone back, keep sparks away and call 111 and the gas network from a safe distance. Do not try to fix it. WorkSafe warns a utility will likely charge you to repair its pipe, and beforeUdig plans may not show the pipes you own, so we locate those before anyone digs.

Does a gas line need a pressure test?

Yes, every new or altered section is tested before gas goes into it, and again after any repair. The pipe is pressurised and watched on a gauge for any drop, using the method in AS/NZS 5601.1, the standard the gas regulations cite. Then we purge the air, fit isolation valves where needed and light every appliance.

Can a gas pipe run under or through a concrete slab?

Yes, with protection. Pipe through or under a slab goes in a sleeve or jacket so it can move and is kept off the concrete, and fittings in the slab are avoided or wrapped. On a new build we place the sleeves before the pour. For an existing slab we usually find a route around it.

Get your gas line sorted

Tell us what you want to run and where, and we come back with a route, a pipe size and a written price.

Get help with gas lines & pipework

Get my quoteGet a quote