Renovations & Builds

Renovation Plumbing in Auckland

We sort the pipes for Auckland homeowners and builders before the walls come off, then rough in, test, fit off and sign off. Gutting a bathroom, shifting the kitchen sink or turning the old washhouse into a proper laundry all start the same way.

We can plumb for your builder, or run the whole renovation with our own electrician, gasfitter and drainlayer, and the builder, waterproofer and tiler booked and managed by us. Every job is signed off by our in house certifying plumber, and home workmanship carries the Master Plumbers Guarantee, up to $20,000 including GST.

  • Master Plumbers member logo

    Master Plumbers Member

  • Site Safe member logo

    Site Safe Member

  • Certifying Plumber, Certifying Gasfitter and Certifying Drainlayer

    Certifying Plumber, Gasfitter and Drainlayer

  • Google logo

    Google Rated 4.9

Get help with plumbing renovations

Overview & Answer

What does a plumber do on a renovation?

A renovation plumber works out what the old pipes can take, checks whether your plan needs consent, then runs new water and waste pipes before the linings go on. Once the waterproofing, tiles and cabinets are in, we come back to fit the taps, toilet and appliances, test everything and hand over the paperwork.

Get us in before the layout is locked. Moving a toilet or a shower waste looks easy on paper and gets dear once the floor is down, because drain fall, venting and pipe sizes often decide where things can go.

Hit a pipe or found trouble with the wall open?

  1. Water spraying

    Shut the main tap or the toby beside the meter. On a tank supply, switch the pump off at the wall. Then call us.

  2. Water near wiring

    Keep clear of wet power points, lights and leads. Only flick the main switch off if you can reach it standing somewhere dry.

  3. Old sheet that might be asbestos

    Homes built before 2000 can have asbestos in wet area sheet, vinyl and tile backing. Stop, keep people out and leave it uncut and unswept until it is tested.

  4. Gas smell

    Turn the gas off at the bottle or meter if you safely can. No flames or switches. Get outside, ring 111 if it is strong, then Vector on 0800 764 764 or the LPG number on your bottle.

Call 09 873 6671

Scope & Inclusions

  • Pipe and drain planning for new layouts
  • Consent and exemption checks
  • Rough in of water, waste and vent pipes
  • Fit off of taps, toilets, showers and appliances
  • Gas and drain changes signed off in house
  • Certificates and as built records

Need something else?

Rooms & Projects

Which room are you changing?

Each room has its own page with the detail. This page covers what every renovation shares.

  • Bathrooms

    Showers, baths, vanities and toilets, wet area floors, waterproofing and level entry showers.

    Bathroom Plumbing
  • Kitchens

    A sink moved to an island, dishwasher and fridge lines, waste disposals and a gas hob.

    Kitchen Plumbing
  • Laundries

    Tubs, washing machine taps and wastes, or moving the laundry inside or into the garage.

    Laundry Plumbing
  • New Builds

    Extensions, granny flats and new homes, from under slab drains to final sign off.

    New Build Plumbing

Management & Scope

Plumbing only, or the whole job?

Plumbing only: your builder or kitchen company runs the site and we slot into their programme for strip out, rough in and fit off. They look after the other trades.

Design and build: we run the lot. Layout, consent, building, waterproofing, tiling, electrical, plumbing, gas and drains sit under one quote and one programme, with one person to ring when something comes up.

Proof & Promise

Why renovate with Taylor?

  • Every ticket in one team

    Our in house certifying plumber, gasfitter and drainlayer sign off the work, and we are Master Plumbers members. Work in your home sits under the Master Plumbers Guarantee for 12 months, to a limit of $20,000 including GST. The labour carries a lifetime guarantee too; the parts are under the maker's warranty.

  • Every tiled shower flood tested

    We flood test every tiled shower before it goes into use, so a leak shows up before the tiles do.

  • Pipes planned before the layout is locked

    We check drain fall, venting, pipe sizes and hot water against your plan and the actual fixture models.

  • Tested before it is covered

    Every new pipe is pressure tested before the linings go on, and we photograph where it runs in the wall.

  • Paperwork handed over

    Certificates, as built drawings and warranty registrations go to you at the end, ready for the code compliance certificate.

  • There when it goes wrong

    24/7 if a pipe gets hit mid job, and a straight price for any hidden problem before we touch it.

Consent & Compliance

Does your renovation need building consent?

A lot of renovation plumbing does not. An authorised plumber can repair or replace pipes and fixtures with comparable products in the same spot, and can alter the existing plumbing, provided the total number of fixtures in the house stays the same and no specified system is touched.

Adding a toilet, basin or shower where there was none, a new tiled wet area shower, structural changes and most new drains are different. Water heaters have their own rules. Auckland Council leaves the call to the owner, will not exempt work after it is done and flags apartments, terraces and tiled floors, so we check the whole plan before demolition.

Compliance & Handover

The paperwork you should end up with

On consented work the council inspects the plumbing before the linings go on, or an endorsed certifying plumber self certifies it under the scheme that began in 2026. Self certified work comes with a certificate of compliance, sent to you and the council within 10 working days of finishing. Apartment buildings sit outside that scheme.

Your builder gives a record of work for any restricted building work, the waterproofer a producer statement for the membrane, and the gasfitter and electrician their own certificates. With those in hand you apply for the code compliance certificate.

Exempt work gets no council sign off, so ask for a written note of what was done and who did it. Keep everything in one folder for buyers and insurers.

Builders & Waterproofing

Where the plumbing meets the other trades

Plumbing is not restricted building work, but on a consented job, cutting a bearer for a waste, moving a load bearing wall or changing a window is. That part has to be done or supervised by a licensed building practitioner.

The leaks we pull apart usually start at a join between trades: a mixer body set at the wrong depth for the tiles, a waste sitting proud of the membrane, a shower floor without enough fall. We set mixer depths and waste heights to your actual tile and membrane, and the membrane gets checked before anyone tiles over it.

Timing & Access

Sort the old pipes while you can reach them

Galvanised steel is missing from MBIE's list of accepted water pipe, and grey Dux Qest, sold from the late 1970s until about 1987, has a record of splitting at its joins. If either turns up behind the linings, swapping it now saves pulling the wall apart again later.

We show you what we find, with photos, and price the swap as its own line so you decide. Plenty of old copper is fine, and we tell you so.

Cylinders & Sizing

Will the cylinder keep up?

A second shower, a bath you actually fill or a move off low pressure changes what the hot water has to do. We check the cylinder size, its age, the pressure and the pipe run before you fall in love with a rain shower head.

Under current Building Code guidance, new bathroom fixtures get water no hotter than 50°C while the cylinder holds 60°C or more, so we fit a tempering valve or set the controls to match.

Trades & Sequence

Who turns up when

The usual run is strip out and cap off, framing and any drain work, our rough in, a pressure test and the pre line inspection, then linings, waterproofing, tiling and cabinets, then our fit off and a final test. The electrician threads through the same stages.

We lock the dates in with your builder at the start and confirm every fixture before rough in, because the pipe positions come from the exact models.

Access & Ageing

A bathroom you can still use at 85

Staying put for the long haul? Think about a level entry shower, a wall hung toilet at a comfortable height, lever taps, a thermostatic mixer and solid timber in the walls so grab rails can go up later.

Level entry is not automatically accessible. The floor fall, the drain position, the screen and the door width all have to work together, so we plan them with you or your occupational therapist.

Process & Steps

From rough sketch to sign off

  1. 01

    Tell us the plan

    The address, the rooms, what is moving, who else is involved and any drawings or photos. A sketch on the back of an envelope is fine.

  2. 02

    Site check

    We look under the floor and in the ceiling, check the pipe types, drains, pressure and hot water, and flag anything that affects consent.

  3. 03

    Written quote

    Plumbing, gas and drains itemised, any allowance for hidden work spelt out, what other trades cover, and GST shown.

  4. 04

    Rough in, test, fit off

    We run and test the pipes, come back once the finishes are in, fit and commission everything, then hand over the paperwork.

Costs & Quotes

How renovation plumbing is priced

There is no set price, because a like for like swap and a full relayout with new drains are miles apart. We price your plan once we have seen the house.

The quote breaks out strip out and capping, rough in, fit off, gas and drain work, old pipe replacement, hot water changes, consent and inspection costs, travel and GST. Products are listed on their own lines, whether we supply them or you do.

The price climbs with a moved toilet or shower waste, extra fixtures, tight access under the floor or through a slab, old pipe in the walls, a bigger cylinder and every extra return visit the build programme needs.

Anything hidden that shows up once the walls are open is priced and agreed with you in writing before we do it.

Hire us directly for building work worth $30,000 or more including GST and the law requires a written contract. We give you the disclosure statement and checklist before you sign.

Request a quote

Auckland & Islands

Renovations around Auckland

Isthmus villas and bungalows often hide galvanised pipe, earthenware drains and low pressure hot water, and some inner suburbs still drain to a combined pipe, so the site check tells us more than photos. On a rural tank or septic, new fixtures mean we also check the pump, the filters and the wastewater system.

Consents go to Auckland Council on 09 301 0101, a villa in a special character area may need resource consent for outside changes, and apartments need body corporate approval. We work in every zone from City & Isthmus to Henderson & Hobsonville and Pukekohe & Waiuku, with rural and island travel confirmed first.

Auckland Council minor plumbing

Customers & Properties

Homeowners, builders, designers and landlords

  • Homeowners living on site

    We stage the work so a toilet and a shower keep running wherever the layout allows, and warn you before every shutdown.

  • Builders and kitchen companies

    Plumbing to your programme and set out drawings, with rough in and fit off booked around your site.

  • Designers and architects

    Ring us before the drawings go to council about falls, vents and where the cylinder lives.

  • Landlords and property managers

    Rental upgrades planned around tenant access, with photos and certificates sent to you.

Related & Similar

Related renovation services

View all plumbing services

Questions & Answers

Renovation plumbing questions

How much does renovation plumbing cost in Auckland?

You get an itemised written quote after a site check. Leaving fixtures where they are costs least, while shifting a toilet or shower waste, adding fixtures, replacing old pipe and upsizing hot water all add to it. A finished room price includes building, tiling and products, so it says little about the plumbing share.

Can my builder or I do the plumbing?

No. Fixing or moving pipes, wastes, traps and fixtures is restricted to people authorised by the Plumbers, Gasfitters and Drainlayers Board, and a builder's licence does not cover it. Check any plumber's name on the PGDB public register before they start.

Do you need plans before you can quote?

No, a sketch and a few photos are enough to start. For a firm price we need to see the house, the existing pipes and drains, and the fixture list.

Can a toilet or shower be moved without consent in Auckland?

Often, yes, if an authorised plumber does it, the number of fixtures stays the same and no specified system is affected. Shifting a gully trap counts as a minor drain change. What usually decides it is the floor: on timber we can run a new waste underneath, while a concrete slab has to be cut and patched, and Auckland Council looks harder at apartments and terraces.

What is involved in adding a toilet or ensuite?

Usually a building consent, because the number of fixtures goes up. The new toilet needs a waste with enough fall to the drain, venting, water supply and often more hot water. On a septic system we also check it can take the extra load. We sort the plumbing drawings for the consent.

Can I supply my own taps, toilet and vanity?

Yes, just send us the model numbers before you buy. Taps and fittings have to be fit for drinking water, suit your water pressure and match the set out we run the pipes to.

Can we stay in the house while you work?

Usually, if there is a second toilet or we can keep one working. We plan the stages so the water is only off for short, booked windows, and we tell you which taps are affected before each shutdown. If the only bathroom is being gutted, talk to us early about a temporary toilet or shower.

What happens if you find problems behind the walls?

We stop that part, make it safe and show you what we found, with photos. Rotten framing, old leaks or dodgy past work are common once linings come off. You get the options and their cost in writing before any extra work, and if it changes the consent, the council may need to approve it first.

How long does the plumbing take on a renovation?

Two visits from us, rough in and fit off, with linings, waterproofing and tiling between them. The other trades set the total time, so we lock our dates in with your builder at the start and keep you updated if anything shifts.

Should I switch to mains pressure while renovating my villa?

Often it is the best time. Mains pressure means a stronger shower and better mixer choice, but old pipes and fittings that coped with low pressure can leak once pressure goes up. With the walls open we can replace them, fit a pressure limiting valve and swap the cylinder in one go.

Can you move the laundry into the garage?

Yes, as long as we can get a waste out with enough fall and run hot and cold water to it. A tub and washing machine on an outside wall near the drain is the easy version. Across a slab or away from the drain takes more work, and a pump may be needed.

Will Watercare charge a growth charge for a granny flat?

It can. Watercare charges an Infrastructure Growth Charge per new residential unit, and from 1 July 2026 the metropolitan figure is $29,348.46 incl GST. Whether your minor dwelling counts is Watercare's call, so ask it before you commit. We never fold that charge into our price.

Do I need body corporate approval to renovate an apartment bathroom or kitchen?

Usually, yes. Waste stacks, risers, fire walls and floor slabs are typically common property, so any new hole, moved waste or shutdown needs the body corporate's written approval first. Check the rules for work hours and noise too. We send the plan and method to the building manager.

Can you plumb a granny flat or extension in Auckland?

Yes. Extensions usually go through consent like any build. A small standalone granny flat can now be built without consent if it meets the exemption's conditions, but its plumbing and drainage must still be done by authorised tradespeople and meet the Building Code.

Our old house has a combined drain. Should we separate it while renovating?

Often it is worth it. Parts of the CBD and inner isthmus still have pipes carrying stormwater and sewage together, and council programmes are building separate stormwater so properties can connect to it. Our drainlayer checks what runs in your street before the trenches open.

Plan your renovation plumbing in Auckland

Send us the rough plan and a few photos. We come back with what can move, what needs consent and a written price.

Get help with plumbing renovations

Get my quoteGet a quote