Stormwater Detention Tanks in Auckland

Taylor Plumbing puts in detention tanks, retention tanks and combined reuse and detention tanks across Auckland, built to the engineer's design and signed off with the council by our in house certifying drainlayer. Consent conditions asking for stormwater detention on your new house, extra unit or subdivision are the usual starting point. We fix existing tanks too, 24/7 when one spills in a storm.

  • Master Plumbers member logo

    Master Plumbers Member

  • Site Safe member logo

    Site Safe Member

  • Certifying Plumber, Certifying Gasfitter and Certifying Drainlayer

    Certifying Plumber, Gasfitter and Drainlayer

  • Google logo

    Google Rated 4.9

Get help with stormwater detention tanks

Overview & Answer

When do you need a stormwater detention tank in Auckland?

When you add or redevelop more than 50 square metres of roof or paving in one of Auckland's Stormwater Management Area Flow zones, or a consent condition asks for one. The Unitary Plan wants some runoff kept on site and the rest released over 24 hours. A detention tank catches the storm and lets it out slowly.

Your engineer sizes it, and the council's tank guidance sets how it is built and recorded. We tell you which rules apply before you spend on design.

Tank spilling toward the house? Do this first

  1. Look, never climb in

    Tank makers class the inside of a stormwater tank as a confined space, for trained crews only. Check it from the lid, and keep kids and pets well back from an open riser.

  2. Turn the water

    Sandbags or boards will steer the overflow away from walls and the subfloor. Keep it off the neighbour's section, stay out of moving floodwater and ring 111 if anyone is in danger.

  3. Street drains flooding?

    When public stormwater pipes are overflowing, report it to Auckland Council on 09 301 0101.

Call 09 873 6671

Scope & Inclusions

  • Detention tanks for new houses and extensions
  • Retention tanks for reuse
  • Combined reuse and detention tanks
  • Underground, slimline and modular tanks
  • Orifice outlets, screens and overflows
  • As built plans and council inspections

Is a detention tank the right fix?

Triggers & Timing

Signs your detention tank needs a look

Lift the lid a day after decent rain, without leaning in.

  • Still brimming next day

    A detention tank should drain right down between storms. One still full after a dry day has a blocked orifice or outlet, so the next storm goes straight over the top.

  • Overflow running in a shower

    An overflow pipe flowing in light rain means the tank has lost its spare room, usually to silt or a clogged screen.

  • Bone dry in a downpour

    No water in heavy rain points to a cracked inlet, a downpipe running elsewhere or a missing orifice plate, so nothing is being held back.

  • Muck in the leaf guard

    Grit and leaves piling up at the inlet are settling in the tank too, and heading for the orifice.

  • Ground sinking over a buried tank

    Soft lawn above an underground tank can mean a cracked shell, a leaking joint or a pulled inlet.

  • Bought a place with one

    A tank required by a consent is often recorded on the title or LIM, and the upkeep comes with the house. Get it checked soon after settlement.

Detention & Tanks

Four ways to hold stormwater back

The design picks the volume. Space on the section and the soil usually pick the tank.

  • Round tanks above ground

    The simplest setup, with the orifice low down so it empties between storms. It needs a level, compacted pad and restraint against wind and earthquakes.

  • Underground tanks

    Buried tanks give you the yard back. They need hold down so groundwater cannot float them, risers to reach the orifice and silt, and on unstable land a sealed tank so stored water stays out of the slope.

  • Slimline and modular tanks

    Narrow tanks along a fence, or modular cells under a deck or paving, suit tight infill sections where a round tank will not fit.

  • Combined reuse and detention

    One tank doing two jobs. The lower part keeps rain for toilets, laundry or the garden, and the upper part stays empty for storms, draining through an orifice set partway up the wall.

Scope & Price

What sets the tank size and the price

The design drives most of it. On site we check:

  • New roof, driveway and paving draining to the tank
  • Whether the site is in a SMAF zone or under a consent condition
  • Where the outlet can discharge: public pipe, kerb or stream
  • Soil, slope and any stability hazard rating on the land
  • Room for the tank, digger access and what gets reinstated
  • Reuse inside the house, which can shrink the detention share

Every extra square metre of seal adds to the tank, so settle the patio and the carport before the tank is ordered.

Proof & Promise

Why call Taylor about a detention tank?

  • Certifying drainlayer

    Tanks, orifices and outlet pipes are drainlaying, so our in house certifying drainlayer signs off the work, and home jobs carry the Master Plumbers Guarantee: 12 months, up to $20,000 incl GST.

  • Built to the design

    Orifice size and height, overflow, screens and outlet levels go in exactly as drawn, and anything on site that does not match goes back to the engineer before it is buried.

  • Chart sizing for simple jobs

    We read your consent conditions and SMAF zoning with you, and anything that needs a design goes to a stormwater engineer.

  • Diggers, vacuum gear and cameras

    Our own diggers for the hole, vacuum gear to pull silt from tanks, and a drain camera for the outlet line.

  • Storm night call outs

    Ring at 2am about a tank spilling at the house and a person picks up, then a crew gets on the road, 24/7.

  • Paperwork that passes

    Inspections booked, an as built plan showing the tank, orifice and overflow, and a written quote with GST before a sod is turned.

Council & Rules

When the council wants stormwater held back

In Auckland the Unitary Plan sets the rule. Inside a Stormwater Management Area Flow 1 or 2, new or redeveloped hard surface over 50 square metres needs resource consent and hydrology mitigation: at least 5 mm of runoff retained, then detention draining over 24 hours, sized to the 95th percentile rain in SMAF 1 or the 90th in SMAF 2.

In practice that reaches new houses on bare land, extra units on infill sections and subdivision lots.

There are adjustments. Where soils take less than 2 mm an hour and reuse is not available, the retention share can be taken up as detention instead. Where development covers more than half the site, mitigation applies to the whole site. Devices must work before the building is used, with as builts sent within three months.

Hydraulics & Design

Hydraulic neutrality and the orifice

Hydraulic neutrality means a built site sends no more water down the pipe at the height of a storm than it did as grass. Auckland adds retention on top: keep some rain on site for good, through reuse or soakage, and slow down the rest.

The orifice does the work. It is a small hole in a plate or cap on the outlet, so rain pours in faster than it can leave and the tank fills, then drains over the following hours. Its size comes from the design, built to Auckland Council's tank guidance, and a little dead storage below it catches silt.

A screen is required where detention flows into a piped network, plus an overflow for bigger storms. A hole that small chokes on leaves and grit, so getting at it easily matters as much as the tank.

Reuse & Detention

Making one tank do two jobs

Auckland's rules reward keeping rain. Retention, through reuse in the house or soakage, comes first, and a dual purpose tank sits one third retention and two thirds detention. Our Rainwater Tanks page covers the reuse side.

A tank topped up from the public supply needs a medium hazard testable backflow device. Where a resource consent requires the tank, an encumbrance goes on the title, so every future owner has to keep it working.

On body corporate and commercial sites, the water use the design counts on is written onto the title or land use consent.

Cleaning & Upkeep

Keeping the orifice clear

A detention tank runs itself until the orifice blocks. Tank makers want the lid, leaf guard, silt trap, overflow and orifice checked at least once a year, and Auckland Council's tank guide adds clearing gutters every six months.

Light grit can be hosed off the outlet mesh from above. Heavy silt needs a vacuum truck. The council expects owners to maintain these tanks under its Stormwater Bylaw and keep records, so write down every check.

Check your LIM and title before buying.

Process & Steps

From consent condition to signed off tank

  1. 01

    Send the plans

    Site plan, the engineer's stormwater design or the council conditions, and photos of where the outlet could go.

  2. 02

    Check it on site

    We confirm levels, the discharge point, soil and access, and flag anything the drawings missed.

  3. 03

    Written price

    Tank, orifice, overflow, pipework, digging, reinstatement, consent steps and GST, line by line. Work starts on your yes.

  4. 04

    Install and sign off

    Tank bedded and restrained, orifice fitted to the design, flow tested, inspection booked and an as built plan handed over.

Costs & Quotes

How detention tank work is priced

New tanks are quoted in writing from the design, because the volume, the tank type and the dig make up most of the cost.

Our quote lists the tank and fittings, orifice and screens, overflow and outlet pipe, excavation and cart away, bedding and hold down, reinstatement, any engineer and council fees we arrange, travel and GST.

Servicing or checking an existing tank is a shorter visit, and you hear the charge before we come.

Request a quote

Auckland & Islands

Detention tanks around Auckland

More than half of Auckland's new dwellings are now townhouses, units and other attached homes, and many sit on detention tanks. We install and service them from our Wiri depot across every zone on our locations page, and travel outside metro Auckland goes on the quote first.

SMAF 1 covers the catchments with the most sensitive streams and SMAF 2 the next tier. The plan maps show which applies, and some resource consents add their own conditions on top.

Stormwater stays with Auckland Council Healthy Waters, not Watercare, so the council inspects these tanks and keeps their as builts.

Unitary Plan E10: SMAF 1 and 2

Customers & Properties

Who calls us about detention tanks

  • Owner builders and new home buyers

    We build to the tank and orifice your consent names and hand over the plan for your code compliance file.

  • Builders and designers

    Bring us in at drawings stage, so the tank, levels and outlet are sorted before the slab goes down.

  • Developers and infill

    Extra units and new lots, each tank built to the engineer's plan.

  • Landlords and body corporates

    Yearly checks, silt removal and a written report you can hand to owners, the body corporate or the council.

Related & Similar

Related stormwater services

The other ways we deal with rain on a section.

View all drainlaying services

Questions & Answers

Detention tank questions

How much does a detention tank cost in Auckland?

The volume, the tank type and the dig set the price. We price from the design and list the tank, orifice, pipework, excavation, reinstatement and GST, and nothing extra goes on without your say so.

What is the difference between a detention tank and a retention tank?

A detention tank empties itself, while a retention tank keeps the water. Detention stores storm runoff for a few hours and lets it out slowly through a small outlet. Retention holds rain for you to use on the garden, toilets or laundry. A combined tank does both, with reuse water in the bottom and storm space above.

Do infill units and subdivisions need detention in Auckland?

Inside a SMAF zone, most do: every new unit adds roof and paving, and more than 50 square metres of it triggers resource consent and hydrology mitigation. Outside those zones, your resource consent conditions decide.

What size detention tank do I need?

Whatever your design says. In a SMAF zone the engineer works from the 95th percentile 24 hour rainfall in SMAF 1 or the 90th in SMAF 2, takes off the retention volume, and sizes the orifice to drain the rest over 24 hours. More roof and paving means a bigger tank.

Can my rainwater tank be a detention tank as well?

Yes, if it is built as a combined tank. The bottom section stays full for household use and the top section is kept clear for storms, with the orifice set on the line between them. Auckland Council's tank guide describes a split of one third reuse and two thirds detention.

What is an orifice on a detention tank?

It is the small, sized hole that controls how fast the tank empties. It sits in a plate or cap on the outlet, and its diameter comes from the design, often only a couple of centimetres. Never drill it bigger or pull it out, because the tank then holds nothing back and the site no longer meets its consent.

Why is my detention tank always full?

Nearly always a blocked orifice or outlet pipe. Leaves, grit or slime close the hole, so the tank never drains and spills from the overflow in every shower. Look at the leaf guard and screen from the lid. If it is still full after a dry day, we clear the orifice and run a camera down the outlet line.

How often should a detention tank be cleaned?

Check it every year and clean it when silt builds up. Inspect the screens, orifice and filters yearly, and drain and clean the tank every two to three years. Trees over the roof or a gravel drive feeding the tank mean cleaning more often.

Does a detention tank need a building consent in Auckland?

Yes. Auckland Council's tank guidance treats detention and retention tanks as drainage work, so the tank, orifice and overflow go on the building consent drawings with the sizing behind them, and an as built plan follows.

Who is responsible for maintaining a detention tank?

The property owner. Auckland Council expects owners to maintain the tank under its Stormwater Bylaw and keep records, and a tank required by a resource consent carries an encumbrance on the title. On a rental it sits with the landlord. For a tank shared by several units, check the title.

Can I take out a detention tank I do not want?

Not without the council's say so. Where a resource consent required the tank, the encumbrance on the title binds every owner to keep it, and pulling it out would breach the consent. Talk to the council before you change anything.

Can a detention tank go under the driveway?

Yes, if the tank is rated for vehicles and buried with enough cover. It also needs hold down against groundwater lifting it, and risers so the orifice and silt can be reached. On steep or unstable ground, the tank has to be sealed so stored water cannot soak into the slope.

What is a SMAF area and is my property in one?

SMAF stands for Stormwater Management Area Flow, the Unitary Plan's zones where streams are most sensitive to extra runoff, split into SMAF 1 and SMAF 2. If your site sits in one, more than 50 square metres of new hard surface brings retention and detention rules. The Unitary Plan maps show whether it does.

Can I install a detention tank myself?

Not the drainage part. Pipes into and out of the tank count as stormwater drains, so the work is a licensed drainlayer's under the Plumbers, Gasfitters, and Drainlayers Act. You can cut the bill by clearing the spot or relaying the garden afterwards.

What happens at the council inspection?

The inspector checks the tank, orifice, overflow and pipes against the approved plans before the trench is filled in. Auckland Council inspects from 8am to 4pm on weekdays, and next day slots must be booked before 1pm. We book it, meet the inspector on site and draw the as built, which the plan rules want within three months.

Got a detention condition on your consent?

Send the site plan and the engineer's design or the council's conditions. We check it and price it in writing.