Septic & Wastewater
Septic Tank Installation in Auckland
We design, consent and install septic tanks, aerated and other secondary treatment systems and disposal fields across rural Auckland and the islands, for new builds and replacements, with our in house certifying drainlayer and our own diggers. Building on a section with no sewer, or an old septic field that has given up, both land here. We handle the soil assessment, the council paperwork and the dig, and hand over a system that suits your ground and your household.
Get help with septic installation

Master Plumbers Member

Site Safe Member

Certifying Plumber, Gasfitter and Drainlayer
Google Rated 4.9
Get help with septic installation
Overview & Answer
Do I need consent to install a septic tank in Auckland?
Yes. A new system, or a replacement for a failed one, needs a building consent from Auckland Council. The discharge is allowed without a resource consent only when the design meets the Unitary Plan's E5 permitted standards, which include secondary treatment for new systems. A certifying drainlayer must do or supervise the work.
The design comes first. A site and soil assessment shows what your ground can take, which decides the tank, the treatment level and the field. We run both consents as one job.
Sewage on the ground or an alarm going? Do this first
Effluent surfacing outside
Keep children and pets off the wet ground and away from any open pipe. Cut water use right down: no washing machine, no long showers. Wear gloves and boots if you have to go near it, then wash your hands well.
Treatment plant alarm
Find the plant's breaker at your switchboard and reset it once. If it trips again or the alarm carries on, leave it and call your service agent or us. The mute button only silences the noise.
Sewage backing up inside
Stop running water and keep everyone out of that room. Do not flush toilets until the cause is found, whether it is the pipe, the tank or the field.
Lids and covers
Leave tank lids and plant covers on. Only a service agent should open them, and nobody should lean into or climb inside a tank.
Scope & Inclusions
- New septic tank installs for new builds
- Aerated and secondary treatment systems (AWTS)
- Passive and worm based systems with no power
- Trenches, beds, mounds and drip irrigation
- Wastewater design reports for consent
- Replacing failed tanks and disposal fields
Need something else?
System already in and due for a pump out or service?
Septic Servicing & Pump OutsSewer now runs past and you want off septic?
Sewer & Public Drain ConnectionsPipe blocked between the house and the tank?
Drain UnblockingNeed a pump to lift wastewater up to the field?
Pump Stations
Triggers & Timing
Septic jobs we get called for
Most calls start with a new section, a failing field or a bigger household.
Building where there is no sewer
The septic design goes in with your building consent, so start it alongside the house plans.
Wet, smelly ground over the field
Spongy ground, bright green grass or dark liquid seeping from the trenches means the field has stopped soaking it away.
Adding a sleepout or minor dwelling
More people means more wastewater, so the existing system needs checking for the extra load.
Buying a rural property
Ask the seller for the consent records and servicing history, and get the system checked before you go unconditional.
Paths & Options
Septic tank or secondary treatment
Treatment level and disposal method are two choices, and your site decides both.
Septic tank (primary)
Solids settle and start breaking down in the tank, then the liquid runs to trenches or beds where the soil finishes the job. It needs free draining ground and room, but no power.
Aerated treatment plant (AWTS)
Air pumped through extra chambers treats effluent to a secondary standard so it can go out through drip lines. It suits tight, wet, sloping or sensitive sites, but needs power at all times and regular servicing.
Passive secondary systems
Some worm based and bed systems treat to a secondary standard by gravity, with no power at all. Handy where outages are common, though worm systems can ask more of the owner.
The disposal field
Septic effluent goes to trenches or beds. Secondary effluent usually goes to drip lines 100 to 150 mm down or under mulch. A sand mound lifts the field where the ground is wet or shallow.
Proof & Promise
Why call Taylor about a septic system?
Certifying drainlayer and plumber
Our in house certifying drainlayer runs every septic install and signs it off. Home work carries the Master Plumbers Guarantee: 12 months, up to $20,000 incl GST.
Design and consents handled
The wastewater designer we brief does the site and soil assessment and design report, and we lodge the building consent and any resource consent with Auckland Council.
Any system for any site
Concrete and plastic septic tanks, aerated plants, passive and worm systems, drip lines and mounds, supplied and installed.
Our own diggers and crew
We dig, lay, connect and reinstate with our own gear, so the house drains, tank, field and power trench are one team's work.
24/7 when a system fails
Effluent on the lawn or an alarm that will not stop gets a real person on the phone, day or night.
Paperwork you can find later
A written quote with GST shown, then the as built plan, producer statement, manuals and servicing set up before we leave.
Consents & Inspections
Three approvals on one job
Auckland Council issues the building consent and inspects the work across the whole region, from Wellsford to Waiuku and the islands. Building Code clause G13 covers on site disposal, and the council's own design guidance builds on the national standard for onsite systems.
The same council controls the discharge through the Unitary Plan. A new household system up to 2 cubic metres a day is permitted when it meets E5: at least secondary treatment, enough land for the flow, a reserve area, and drip irrigation no heavier than 5 mm a day. Unit titles and cross leases fall outside the permitted path, and anything else needs a resource consent.
The drains, tank connections and field are restricted drainlaying, so a certifying drainlayer does or supervises them. Check any name on the PGDB public register.
Soil & Slope
What the designer looks for
Test pits go at least 2 metres below where the field will sit. The designer logs the soil, estimates how high the water table rises in winter and, for trenches in slower soils, runs soakage tests. The soil gets a category from one to seven, which sets how much effluent each square metre can take.
They also map streams, bores, boundaries, banks, buildings and the coast, because setbacks from each one shape where the field can go. Council maps and the property file add what is already known about slope and flooding on your site.
Sizing & Capacity
How big it needs to be
Size starts with how many people the house can sleep. Auckland designs work from the council's guideline at a minimum of 120 litres a person a day, and the field size follows from that flow and your soil.
The tank holds the solids, but the field does the real work. Heavy clay needs a far bigger field than free draining loam for the same house.
Failure & Replacement
When the old system gives up
Fields fail from age, roots, stormwater in the trenches, too many people or a tank left too long between pump outs. We find which part failed first. Sometimes a pump out, an outlet filter and moving the stormwater away buys real time.
If the field is finished, the new one has to meet today's rules, which in Auckland means secondary treatment where the old house got by with a septic tank and trenches. That replacement needs a building consent like any new install. We pump out and decommission the old tank so it cannot collapse or fill with water later.
Environment & Setbacks
Near the coast, streams and wetlands
The E5 rules keep fields set back from the coast, streams, wetlands, bores and boundaries, and limit them in flood zones and on steep slopes. Sandy coastal ground on the east coast and the islands drains fast, but shallow groundwater underneath can take effluent before the soil has treated it.
On those sites, and on small sections, the usual answer is secondary treatment with drip lines and planting. A sloping field gets a planted buffer below the lowest drip line so nothing runs off in heavy rain.
Process & Steps
From test pit to sign off
01
Tell us about the site
The address, plans or bedroom count, water supply and any existing system. Not bought yet? We can look first.
02
Assessment and design
Test pits, soil category and a site map, then a design report showing the system, the field and the reserve area.
03
Consents and written quote
We lodge the building consent and any resource consent with Auckland Council and price the whole job in writing, GST shown.
04
Install, inspect, hand over
We set the tank, lay the field, book the council inspections and leave you the as built plan, manuals and servicing details.
Costs & Quotes
How septic installation is priced
We price yours in writing once the site assessment shows what the ground needs. A septic tank on free draining flat ground and an aerated plant with drip lines on steep clay are very different jobs.
Our quote lists the site assessment and design, council fees, the tank or plant with its pumps and alarm, the field and reserve area, drains from the house, excavation and reinstatement, power to the plant, decommissioning any old tank, travel and GST.
Soil and slope move the price most. Clay, rock, high groundwater, a long run from the house, a pump to push effluent uphill, tight digger access and a sensitive site that needs secondary treatment all add cost. Servicing and power carry on after the install.
Nothing outside the quote goes ahead without your yes.
Request a quoteAuckland & Islands
Septic work around Auckland
More than 41,000 Auckland properties run their own onsite system, and one council sets every rule, from the building consent to the discharge. Safe Septic has turned up 1,879 faulty systems in a year, and abatement notices are now pushing many owners to replace failed fields.
From our Wiri depot we work across Kumeu & Helensville, Warkworth & Wellsford, Pukekohe & Waiuku, the Waitakere Ranges and the eastern bays, plus Waiheke, Great Barrier and Kawau. Travel outside metro Auckland is quoted first.
Auckland Unitary Plan E5: onsite wastewaterCustomers & Properties
Builders, lifestyle blocks, baches and landlords
New builds and builders
We work to your build programme and coordinate the house drains, tank and field with your builder and engineer.
Lifestyle block owners
We design for the household you expect in ten years, with room for a minor dwelling.
Baches and holiday homes
A full house at Christmas needs a system sized for the peak. We can meet a caretaker and send photos while you are away.
Landlords and rental owners
We leave the records and servicing schedule the council expects, and work around your tenants.
Related & Similar
Related wastewater and drainage services
Servicing, sewer, pumps and drains each have their own page.
Septic Servicing & Pump Outs
Pump outs, alarms and servicing.
Wastewater Systems
Every wastewater option compared.
New Drainage
House drains for new builds.
Sewer & Public Drain Connections
Moving from septic to sewer.
Pump Stations
Wastewater pumps and alarms.
Stormwater Systems
Keep rain off your disposal field.
Rainwater Harvesting
Tank water for rural homes.
CCTV Drain Inspections
Camera checks on the pipe to the tank.
Questions & Answers
Septic installation questions
How much does it cost to install a septic system in Auckland?
It comes down mostly to your soil, your slope and whether the site needs secondary treatment. A septic tank with trenches on free draining ground costs far less than an aerated plant with drip lines on steep clay. We give you a written price once the site is assessed, so you can compare like with like.
Do I need resource consent from Auckland Council for a septic system?
Not if your design meets the Unitary Plan's E5 permitted standards: a household flow up to 2 cubic metres a day, at least secondary treatment, enough land, a reserve area and setbacks from water and boundaries. Bigger flows, tight sites, unit titles and cross leases need a resource consent, which adds time.
What is the difference between a septic tank and an AWTS?
A septic tank gives primary treatment: solids settle out and the soil finishes treating the liquid. An aerated wastewater treatment system adds air and extra chambers to treat effluent to a secondary standard first, so it can go to shallow drip lines on a smaller area. The trade off is power, an alarm and regular servicing.
Does my Auckland property need secondary treatment?
For a new or replacement system, almost always. The permitted path in the Unitary Plan requires at least secondary treatment, so a plain septic tank and trenches now only suits a working older system that is being maintained. The site assessment decides the level and the field type.
What size septic tank do I need?
Your designer works it out from how many people the house can sleep, at a minimum of 120 litres a person a day in Auckland. The tank is only half the story, because the field size follows from the daily flow and your soil.
Who can design a septic system in Auckland?
A suitably qualified designer, usually a wastewater engineer or specialist designer who assesses the site and writes the design report for consent. We brief the designer, lodge the consent and build what is designed, with our certifying drainlayer signing off the drainlaying.
How long does a septic installation take?
The install itself is usually a few days on site. Most of the time goes before that: the site assessment, the design and council processing, and longer again if a resource consent is needed. Building a house? Start the septic design with the house plans so it does not hold up your consent.
Can I replace my old septic tank like for like in Auckland?
Only for a working system. Repairing or swapping a part can be done without a consent when an authorised person does it and it meets the Building Code. Replacing a failed field or the whole system is treated as a new install, with a fresh design to today's rules. We check what your job needs before quoting.
How do I know my disposal field has failed?
Spongy ground over the field, unusually green grass, dark liquid seeping out, sewage smells and slow drains right through the house are the classic signs. An overdue tank can cause the same symptoms, so a pump out and inspection come first. If the field is finished, it needs replacing.
Do aerated septic systems need power?
Yes, all the time. With the power off an aerated plant does no treatment and its alarm stays silent, so leave it switched on even when the bach is empty. On Great Barrier, with no mains power, a passive system that runs by gravity often suits better.
What is a reserve area for a septic field?
It is a second patch of suitable ground kept free for a new field if the first one fails. The Unitary Plan's permitted standards require one, and it is drawn on the consent plans, so keep it clear of buildings, driveways and big trees. Its size depends on the treatment level and the design.
Can I drive, build or grow vegetables on the disposal field?
Keep vehicles and buildings off it, because weight crushes the pipes and packs down the soil. BRANZ advises against food crops on land taking primary effluent, and even treated effluent carries germs, so wear gloves when working near the lines.
Do I need a maintenance contract for my septic system?
For most treatment plants, yes. The Unitary Plan wants them serviced every six months by a suitably qualified provider, makers often tie the warranty to it, and Safe Septic asks you for the records. Plain septic tanks need an inspection at least every three years and pump outs when due.
Can I connect a minor dwelling to my existing septic in Auckland?
Only if the system has room for the extra people, so it needs checking first. MBIE's exempt building guidance says a sleepout draining to the house's septic system needs that capacity check. A minor dwelling normally needs a building consent, and the design may call for a bigger field or an upgrade to secondary treatment.
I have an abatement notice for a failed septic system. What happens next?
The notice sets what must be fixed and by when, so read the deadline first. Book an inspection to find whether the tank, the pipes or the field has failed. A repair may need no consent, but a new field or system needs a design and a building consent, so start quickly and keep the council informed.
Plan your septic system in Auckland
Send the address and your house plans or bedroom count for the next steps and a written price once the site is assessed.
