Hydro Excavation and Potholing in Auckland
The most expensive thing on a dig is the cable nobody knew was there. Near power, gas, fibre or a tree you want to keep, hydro excavation cuts the soil with water and sucks the mud up a hose, so what is buried comes up whole and visible. We pull the plans, locate, pothole and cart the slurry away.
For homeowners, builders, civil crews, network contractors and asset owners across Auckland, from crowded city berms to rural Rodney and Franklin. A real person answers 24/7.
Get help with hydro excavation

Master Plumbers Member

Site Safe Member

Certifying Plumber, Gasfitter and Drainlayer
Google Rated 4.9
Get help with hydro excavation
Overview & Answer
What is hydro excavation?
Hydro excavation is digging with water instead of a bucket. A lance of pressurised water breaks up the soil, and a strong vacuum hose lifts the mud into a sealed tank on a truck. Because nothing sharp touches the ground, pipes and cables come up undamaged, which is why network owners accept it for potholing.
Hit a cable or pipe? Do this first
Power cable struck
Treat it as live. Stay in the machine unless there is a fire, and if you must get out, jump clear so you never touch the machine and the ground together. Keep everyone at least 10 metres back, ring 111 if anyone has had a shock, then the lines company: Vector across most of Auckland, Counties Energy in Franklin.
Gas pipe damaged or you smell gas
Switch machines off, keep anything that can spark away and move everyone at least 20 metres away and upwind. Ring 111, then Vector on 0800 764 764 for natural gas. Never bury the pipe, push a bucket over it or try a repair.
Fibre or phone cable cut
Do not look into the cut end, because the laser light inside can damage your eyes. Leave it uncovered and report it to the owner named on your beforeUdig plans.
Water main or sewer broken
Keep clear of the water and away from any sewage. Damage to a public water main or sewer goes to Watercare on (09) 442 2222, any hour.
Even a scratch gets reported
A nicked pipe coating or cable sheath can fail months later. Tell the owner straight away, leave it exposed and let them decide on the repair.
Scope & Inclusions
- Potholing to find and prove buried services
- Exposing power, gas, fibre and Watercare lines
- Slot trenches for new cables and pipes
- Digging around tree roots
- Post, pile and pole holes near services
- Uncovering leaking or broken pipes
Need a different job?
Sump, pit or tank full of liquid to suck out?
Vacuum LoadingBig trench, house pad or site cut to dig?
ExcavationWater meter spinning with no tap on?
Leak DetectionPipe found broken once it is dug out?
Drain Repairs
Suitability & Limits
Times a digger or a spade is the wrong tool
If something you cannot afford to break might be in the way, start with water.
Plans show a service near your dig
The beforeUdig map puts a power cable, gas main or fibre duct across the line of your trench, fence or footing.
You need to see it, not guess
A designer, the network owner or a contractor wants the depth and position of a pipe or cable proven before work starts.
A tree you want to keep
The trench or footing runs inside the canopy of a tree whose roots you cannot afford to slice through.
No room for a machine
A backyard behind the house, a narrow side path or a berm full of services where a digger cannot fit or should not swing.
Digs & Excavation
Jobs we do with water and suction
Most hydro digs are one of these. Tell us which services are nearby.
Potholes and test holes
Small, neat holes over a marked service to show exactly how deep it sits and which way it runs, measured and photographed before a machine arrives.
Slot trenches
Narrow trenches for new power, fibre, irrigation or water lines through ground already crowded with other services.
Exposing pipes for repair
Uncovering a leaking water pipe, cracked drain or damaged duct so the plumber or network crew can get straight to it.
Holes for posts, piles and poles
Fence posts, deck piles, signs and pole footings near buried lines, dug clean to the size the engineer or builder wants.
Around tree roots
Soil washed out from between the roots so they stay whole, for an arborist to decide which, if any, can be cut.
Entry pits for boring
Launch and catch pits for thrusting or directional drilling under driveways and roads, dug where every other service is already showing.
Proof & Promise
Why book Taylor for hydro excavation?
One call, one team runs the dig
You ring us. We bring the hydro excavation unit and a trained operator, and run the dig from plans to backfill.
Plans, locate, then pothole
Before any machine digs, we have the beforeUdig plans, sweep the site with a locator and prove each service by eye.
Slurry to a site that takes it
The mud goes in a sealed tank and leaves your property for a site that accepts it, never a stormwater grate. You get the docket.
Operators trained for the job
Our operators work to each network owner's close approach rules.
Certifying drainlayer and plumber
The pipe we expose is fixed by the same team, signed off by our in house certifying drainlayer and backfilled. We are Master Plumbers members.
24/7 for emergency digs
Burst mains and blocked sewers next to live cables cannot wait for Monday. Ring any time and a person answers, with the after hours rate up front.
Networks & Utilities
Power, gas and fibre each have their own rules
Vector runs the power cables across most of Auckland and Counties Energy runs them in Franklin. Either can have cables just under the turf or well over a metre down, sometimes with no warning tape above them. Read their close approach rules on the beforeUdig plans, and treat every cable as live until it is proven otherwise.
Vector also owns Auckland's gas distribution network. Never trust a depth on the plan: find every gas pipe by potholing with hand tools or hydro excavation before a machine goes near. Watercare's Works Over rules apply within 2 metres of a local pipe and 10 metres of a critical one, and proving its pipe by potholing is part of most of those jobs.
Fibre is the cable people forget. One digger strike on a main fibre line can cut broadband to thousands of homes and businesses for hours, and Auckland's berms are full of it.
Safety & Guidance
Assume it is there until you have seen it
WorkSafe's excavation guidelines tell anyone digging to consider services present until it is proven they are not. They say to talk to the service owner before work starts, trace and mark every line, use more than one type of detector, and pothole to confirm the real depth, because ground levels change and drawings drift from what was actually laid.
The guidelines also expect a plan for what happens if a service is hit. A beforeUdig map only shows that a service is there, not exactly where. A deep pothole counts as notifiable work too: if a person works in a hole over 1.5 metres deep that is deeper than it is wide at the top, the business doing it gives WorkSafe 24 hours notice.
Slurry & Disposal
Where the mud goes
Every hydro dig makes slurry, a soup of soil and water. Auckland Council says stormwater grates carry rain only and nothing in them is treated, and its water blasting guidance keeps dirty wash water out of them. So slurry never gets hosed into the gutter or tipped down the nearest grate.
Most slurry is soil, so it usually goes to a site set up to settle out the water and take the dirt. Anything contaminated goes to a facility licensed for that waste, and the docket shows where.
Trees & Roots
Digging under a tree you want to keep
Water washes soil out from between the roots and leaves the roots themselves alone, so an arborist can look at them before anything is cut.
Check the rules first. The Unitary Plan protects notable trees, and many trees in road reserves and parks, and work in their root zone can need consent or Auckland Council's say so. We check the property's overlays before we dig and work to the arborist's plan.
Access & Equipment
Backyards, berms and side paths
The truck stays on the street or the drive and the hose does the walking, over fences, along side paths and under decks.
Digging in an Auckland road, berm or footpath needs a Corridor Access Request to Auckland Transport through MyWorksites, and since 1 July 2026 new requests need a risk based traffic management plan. We lodge the request and the traffic plan so the dig day is not held up.
Process & Steps
Booking a hydro dig
01
Tell us the job
The address, what you are digging for, how deep and how far, and any plans or photos you already have.
02
Plans and locates
We lodge beforeUdig, book the network owner's locate or standover where its rules call for one, mark the services and lodge any Corridor Access Request.
03
Dig with water
The operator sets up cones, digs the potholes or trench, and records each service with depth and photos as it shows.
04
Slurry out, ground back
The tank goes to the disposal site, you get the docket and the photos, and the holes are backfilled or left open for the next trade.
Costs & Quotes
What hydro excavation costs
A handful of potholes on a quiet section and a day of slot trenching beside a busy arterial road are not the same job. Send us the plans and photos and you get a price with GST included before anything is booked.
What moves the price: how many holes or metres, the depth, the soil, how far the hose has to reach, slurry loads and disposal, standover or locate charges set by the network owner, permits and traffic management, travel outside metro Auckland and after hours work.
Small jobs are often charged by the hour on site with a set number of loads. If we expose a broken pipe while we are digging, we price the repair and wait for your yes.
Request a quoteAuckland & Islands
Where we dig
We dig across every zone on our locations page, from City & Isthmus berms crowded with fibre and gas to new subdivisions in Orewa & Silverdale and Pukekohe & Waiuku, with vans leaving the Wiri depot and travel included in metro Auckland.
The networks change as you go: Vector for gas and most power, Counties Energy for power in Franklin, Watercare for water and wastewater and Auckland Transport for the road corridor. We work to whichever rules apply at your address, and quote travel up front outside metro Auckland.
beforeUdig plan requestsClients & Sectors
Homeowners, builders, civil crews and networks
Homeowners
Fences, decks, sleepouts and garden projects near the power and fibre running into the house.
Builders and landscapers
Piles, footings and retaining walls proven clear of services before the auger or digger arrives.
Civil and network contractors
Potholing ahead of drilling and trenching crews, with depth records your engineer can use.
Asset owners and businesses
Work in busy roads, car parks and industrial sites where a strike would stop the whole street.
Related & Similar
Related civil and drainage services
These jobs often come before or after a hydro dig.
Excavation
Trenches, pads and site cuts.
Vacuum Loading
Sucker truck for pits and liquid waste.
Gas Lines
New and replacement gas pipework.
Drain Repairs
Broken and collapsed drains fixed.
Questions & Answers
Hydro excavation questions
How much does hydro excavation cost in Auckland?
You get a price with GST before booking, set by the number of holes or metres of trench, the depth, the soil, the hose distance and how many loads of slurry go to disposal. Locate charges, permits and traffic control can add to it. Send us the plans and a few photos to get it.
Is vacuum excavation the same as hydro excavation?
Hydro excavation is one kind of it. Vacuum excavation is the umbrella name for any digging where suction lifts the spoil. Hydro excavation, or hydrovac, uses water to loosen the ground first, and air excavation uses compressed air. Non destructive digging covers all of them.
What is potholing?
A pothole is a small inspection hole dug straight down onto a marked service to see it with your own eyes. It proves the depth and direction before the main dig starts, and often turns up side connections that were never on the plans. WorkSafe's guidelines expect it wherever services may be present.
Do I need a beforeUdig request for a small job at home?
Yes. A request is free and needs at least two full business days before you dig, even for fence posts. The plans often leave out pipes and cables you own inside your boundary, such as the power to a shed, so a locator sweep is worth doing as well.
Will the network owner come and mark their cable?
Often, with notice. Check the plans from beforeUdig, because each owner sets out how to book a locate or a standover near its assets, and some charge for it. Where an owner does not mark, we locate with our own gear and pothole to prove what we find.
Can the water jet damage a pipe or cable?
Not in trained hands, which is why the operator matters. Near a service the pressure is turned down, the lance is kept moving and the last of the soil is lifted off gently. Old cable sheaths, fibre ducts and brittle pipes get extra care, and anything marked is reported.
Does hydro excavation work in Auckland clay and basalt?
Clay is fine, just slower than sand or loam, and it makes a thick slurry. Auckland's volcanic basalt is different: solid rock and big boulders will not budge with water, so we tell you early if part of the dig needs a breaker or a different method.
What happens to the mud and water?
It stays sealed in the tank on the truck until it reaches a site that accepts slurry, where the water is settled out from the soil. None of it goes into a gutter, stormwater grate or paddock. You get a docket showing where each load ended up.
Can you dig near tree roots without killing the tree?
Yes, that is one of the best uses for it. Water clears the soil and leaves the roots whole, so an arborist can choose what stays. If the tree is a notable tree or a protected street or park tree in Auckland, check the consent rules before working inside its drip line.
Do I need a permit to dig in the berm or footpath?
Yes. Any digging in an Auckland road, footpath or berm needs a Corridor Access Request to Auckland Transport before work starts, and since 1 July 2026 a risk based traffic management plan goes with it. We handle both as part of the job.
Is hydro excavation safer than digging by hand?
Yes. Spades, crowbars and picks still puncture pipes and cut cables. Water does not have an edge, which is why network owners accept hydro excavation for potholing.
Can you reach a backyard or a spot under a deck?
Yes. The truck parks on the road or drive and the hose is run through to the dig, so nothing heavy crosses the lawn. Tell us how far it is from the street and send a photo, and we confirm the hose will reach before we book.
What is the difference between this and vacuum loading?
A hydro dig is about making a hole safely around things you must not break. Vacuum loading empties a pit, sump or tank of muck and water that is already there. The trucks look alike, and both jobs can be booked through us, but the crew, the gear set up and the price differ.
Does Watercare require potholing before work near its pipes?
Near its pipes, Watercare's Works Over rules apply within 2 metres of a local pipe and 10 metres of a critical one, and you want the exact position proven before a machine goes near. Potholing with water is the cleanest way to do that, with depths and photos for the application.
Will you backfill and tidy up afterwards?
Yes. Holes are filled and compacted in layers, with clean, stone free material around any cable and the warning tape put back where the network owner asks for it.
Book hydro excavation in Auckland
Tell us where you need to dig and what might be under there, and we come back with a plan, a price and a date.